26
TEAR DOWN AND STORAGE OF UNIT
Step 1:
Loosen all Velcro/
other closure doors
completely so frame can be
collapsed for storage
Step 2:
Deflate and remove
the decon pool.
Step 3:
Remove the floor.
Step 4:
Carefully bring the
framed unit down to the
ground.
Step 5:
Use the supplied belt
tie (s) to tighten the frame to
it
’
s smallest size.
Step 6:
Place the frame unit,
repair kit, floor, and pool into
supplied carry bag/sleeve.
Step 7:
Use the other
supplied belt tie (s) to tighten
the carry bag further—again
with a goal of attaining a
smaller
‘
footprint
’
for storage.
Step 8:
Store the unit in as
close to room temperature as
is possible and feasible.