Machine zero position with installed Teach-gauge
(same as machine zero position with installed gas
nozzle)
Machine zero position with installed gas nozzle
(same as machine zero position with installed Teach-
gauge)
(1)
NOTE!
The cleaning position of the welding
torch is 80.5 mm (3.17 inches) below
the machine zero position.
If the cleaning head and welding torch are
in the cleaning position, the LED on the
sensor illuminates (1).
37
EN-US
Summary of Contents for Robacta Reamer Braze+
Page 2: ......
Page 11: ...General 11...
Page 12: ...12...
Page 14: ...Warning before the device switches on automatically 14...
Page 16: ...NOTE When lifting the device out of the pack aging do not hold the motor cover to lift it 16...
Page 18: ...18...
Page 19: ...Operating controls connections and mechanical components 19...
Page 20: ...20...
Page 24: ...24...
Page 25: ...Installation and Startup 25...
Page 26: ...26...
Page 44: ...44...
Page 45: ...Service maintenance and disposal 45...
Page 46: ...46...
Page 50: ...11 12 13 4 2 5 mm 0 098 inch 3 2 1 2x 14 15 16 50...
Page 51: ...17 18 180 19 20 1 21 1 5 0 mm 0 197 inch 2 4 3 22 51 EN US...
Page 55: ...13 180 14 15 1 16 1 5 0 mm 0 197 inch 2 4 3 17 4x 5Nm 4 2 3 1 18 55 EN US...
Page 57: ...Troubleshooting 57...
Page 58: ...58...
Page 61: ...Technical data 61...
Page 62: ...62...
Page 64: ...64...
Page 65: ...Appendix 65...
Page 67: ...67...