❒ Mount the flue gas pipe compensator with ceramic fibre seals between ID fan and
flange of the ID console
❒ Screw the included earth wire as potential equalization as illustrated on the left
and the right of the flange
❒ Screw the rubber buffers to the ID console
4.5.26 Installing the FGR air box (optional)
❒ Insert pan cap screw from the back side of the base plate
❒ Put the base plate over the shaft of the FGR flap and fix it with 5 zylinder screws
to the FGR air box
Assembly
4
Mounting steps
Installation Instructions TX 150-250 | M1320112_en
57