4.5 Mounting steps
4.5.1 General information
Boiler front side and boiler back side
The front side is considered as operator side of the boiler. All for operation necessary
elements like combustion chamber door, ash box and control box are arranged on the
front side. The back side is the opposite side. On the back side the stoker unit, the
WOS-drive as well as the whole exhaust gas routing system are arranged.
Heat exchanger left or right
In general it is different, if the heat exchanger of the TX (front view = operator side) is
positioned on the left or the right side of the fire box. Before mounting it has to be de‐
fined, whether the heat exchanger is mounted on the left or the right, as far as it is not
defined by an existing floor plan.
Heat exchanger left
Heat exchanger right
1
Fire box
2
Heat exchanger
The following illustrations of mounting steps show the heat exchanger on the right
side. If the heat exchanger is arranged on the left side, the mounting steps have to be
applied laterally reversed by analogy.
Assembly
4
Mounting steps