![Froling TURBOMAT TM 150 Installation Instructions Manual Download Page 54](http://html1.mh-extra.com/html/froling/turbomat-tm-150/turbomat-tm-150_installation-instructions-manual_2338754054.webp)
4.5.28 Fitting the insulated doors and the ash container to the combustion chamber
❒ Hang the insulated doors on the hinge bolts on the frame.
❒ Position the ash container at the ash removal unit flange.
❒ Push the lever on the side of the ash removal unit flange downwards to lock the
ash container in place.
❒ Push the key plate into the safety switch.
❒ Set the safety switch so that the key plate engages correctly.
❒ Tighten the screws on the safety switch.
4
Installation
Installing the boiler
54
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com