![Froling TURBOMAT TM 150 Installation Instructions Manual Download Page 26](http://html1.mh-extra.com/html/froling/turbomat-tm-150/turbomat-tm-150_installation-instructions-manual_2338754026.webp)
❒ Fit the upper right hand part of the lengthways strut to the cross-pieces.
➥ Ensure that the punched marking “OUTSIDE” is legible when seen from the
right.
❒ Push the bracket under the heat exchanger on the left and fix in place with the
cross-piece.
❒ Push the bracket under the heat exchanger on the right and fix in place with the
cross-piece.
❒ Push the floor insulation into the front area under the heat exchanger.
❒ Fit the front lengthways strut (1) to the cable duct on the heat exchanger.
❒ Fit the cable duct (2) to the front lengthways struts (1).
❒ Fit the frame component (3) for the insulation door at the top to the front length‐
ways strut (1) and at the bottom to the brackets.
❒ Align the frame component (3) with the adjustable feet.
4
Installation
Installing the boiler
26
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com