Fröling Lambdatronic S 3100 Instructions Manual Download Page 35

 

Lambdatroni

c S 3100

 

Control Sy

stem

 

 

 SERVICE  INSTRUCTIONS 

 

B 018 10 04 

 

FRÖLING Heizk

essel und Be

hälterbau

 GmbH 

Page 2 of 24

 

A-4710 Grieskirchen, Industriestr

aße 12, 

Tel.: +43 (0)724

8/606-0 

 

1 Contents 

 

1

 

Conten

ts 2

 

2

 

Hazard information

 

2

 

3

 

Menu - o

ver

vie

w of s

truc

ture

 

3

 

3.2

 

Changi

ng the ta

rget boiler 

temperature

 4

 

4

 

Status d

isp

lays 

4

 

5

 

User me

nu 

4

 

5.2

 

SET 5

 

5.3

 

ERROR DISPLAY 

9

 

5.4

 

ERROR LIST 

9

 

5.5

 

MANUAL DIGI. OUT 

10

 

5.6

 

MANUAL ANAL. OUT 

10

 

5.7

 

MANUAL DIGI IN 

11

 

5.8

 

SYSTEM

 SELECTION 

11

 

5.8.1

 

Systems

 12

 

5.8.2

 

System param

eters 

12

 

6

 

Initial start-up 

13

 

6.2

 

Sw

itch

ing on th

e system

 

13

 

6.3

 

Changi

ng the user code

 

13

 

6.4

 

System sel

ecti

on: boiler t

ype,

 

system

 13

 

6.5

 

Checking th

e drives

 

14

 

6.6

 

Checking th

e door sens

or sw

itch 

14

 

6.7

 

Checking th

e tightness and s

ystem 

pressure

 14

 

6.8

 

Heating u

p the boil

er 

14

 

6.9

 

Setting parame

ters 

15

 

6.10

 

Measuring em

issions

 

15

 

7

 

Troublesh

oo

ting

 15

 

7.2

 

Error message list 

16

 

8

 

Connect

ion di

ag

ram for c

ontrol 

17

 

9

 

Connect

ion inst

ructions

 

19

 

9.2

 

Mains connecti

on 

19

 

9.3

 

Heating circu

it pumps for un

derfloor 

or wall heati

ng 

19

 

9.4

 

Jumper setting

 for actuators 

19

 

9.5

 

Jumper setting

 for solar contro

19

 

9.6

 

Air damper actuator

 

20

 

9.7

 

Flue gas se

nsor 

20

 

9.8

 

Remote control 

20

 

9.9

 

Console RBG 

3100

 

21

 

9.10

 

PC Visualisati

on 

21

 

9.11

 

Heating circu

it pump 0 / Oil - oil 

boiler contact

 

22

 

10

 

List of 

para

mete

r ch

ange

23

 

 

 

2 Hazard  information 

Please rea

d these op

erating i

nstructions car

efull

y before co

mmissionin

g! 

Failure to fol

low

 th

e instructions and a

dvic

e coul

d cause da

mage to the ap

plia

nce and p

ersona

l injur

y. 

 

Hot su

rfaces 

WA

RNING 

 

 

 

 

Risk of burns

 from hot 

parts a

nd p

ois

ono

us s

mok

e inha

lation from 

sm

ouldering w

oo

d! 

 

Before carryi

ng out 

work in the boiler: 

 

ˆ

 

Wait until the “

SHUT

 DOWN

” or 

“OFF

” status has bee

n reached a

nd 

the boiler h

as cool

ed do

wn. 

ˆ

 

Then s

witch off

 the main sw

itch

 

Electrical Haza

rds 

RISK 

 

 

 

 

Electric sho

ck ma

y cau

se in

jury

 or d

eath! 

 

ˆ

 

Only l

ice

nsed te

chnicia

ns ma

y perform 

work

 on electrical 

components

ˆ

 

Observe all ap

plicabl

e stand

ards and re

gulat

ions

 

Unauthoriz

ed person

nel are fo

rbidden from 

workin

g on elect

rical comp

onen

ts! 

 

Summary of Contents for Lambdatronic S 3100

Page 1: ...NG 4 PUMPE 1 PUMPE 2 PUMPE 3 GEBL SE EINGABE 0 A HEIZUNG 1 PUMPE HZG 0 L GEBL SE 2 3 4 1 2 3 2 3 4 5 6 7 8 9 1 1 Two line display 2 Menu buttons 3 Button Start Stop 4 Status LED 5 Operating display fo...

Page 2: ...e instructions and advice could cause damage to the appliance and personal injury Main switch RISK Never stop the boiler using the main switch Do not stop burn off The main switch may only be activate...

Page 3: ...ments The system is operated using a 4 button control unit with a clear menu structure All of the parameters necessary for operation are at the customer s disposal ZUR C ZUR CK EINGABE Feuer Aus Kesse...

Page 4: ...er value The value can now be changed 4 Change the value The up arrow key increases the value The down arrow key decreases the value Changing parameters and values 5 Confirm with the Enter key EINGABE...

Page 5: ...child lock or 1 for customer confirm by pressing Enter If you enter the wrong code the code for child lock will automatically be used User code The name of the set user level will appear briefly Off...

Page 6: ...prog 1 Enter Back Heating phase1 start Heating phase1 end Heating phase2 start Heating phase2 end Heating prog 2 Heating prog 14 same as heating prog 1 Heating circuit 1 Enter Back Heating curve Ente...

Page 7: ...en the set temperature is reached in the DHW the DHW loading pump switches off Set DHW temp 2 55 When the set temperature is reached in the DHW the DHW loading pump 2 switches off Reload if boiler und...

Page 8: ...ue during the drawdown phase is only visible with remote control Flow temperature reduction 15 The flow temp is reduced by this value in the drawdown phase Ex temp heating limit 18 If the outside temp...

Page 9: ...limination of the error has been acknowledged by pressing the ENTER key the status LED returns to green Chapter 7 2 Error message list contains a list of possible error messages 7 Troubleshooting What...

Page 10: ...per closed On actuator swap connection for left with right Check dampers can turn Check cable and connection Storage temp low RELOAD W Top storage tank temperature insufficient for heat supply Info on...

Page 11: ...heating times here Heating phase 1 Heating phase 2 Heating phase 1 Heating phase 2 Start End Start End Start End Start End Heating prog 1 Heating prog 8 Heating prog 2 Heating prog 9 Heating prog 3 He...

Page 12: ...g session 14 00 End of the second loading session 16 00 Heat only once day N Legionella heating65 Y Legionella heating day Sat Solar Set hot water temp 55 Heating circuit 1 Flow temp at outer 10 C 60...

Page 13: ...Lambdatronic S 3100 Control System SERVICE INSTRUCTIONS B 018 10 04 FR LING Heizkessel und Beh lterbau GmbH Page 24 of 24 A 4710 Grieskirchen Industriestra e 12 Tel 43 0 7248 606 0 Notes...

Page 14: ...bdatronic S 3100 SERVICE INSTRUCTIONS FR LING Heizkessel und Beh lterbau GmbH B 018 10 04 A 4710 Grieskirchen Industriestra e 12 Tel 43 0 7248 606 0 Page 23 of 24 10 List of parameter changes Paramete...

Page 15: ...ng circuit pump 0 or as an oil boiler contact depending on the system settings Connecting a HCP 0 up to 2 Ampere Connecting a HCP 0 up to 5 Ampere External feed Connection as an oil boiler contact NOT...

Page 16: ...not be longer than 20 m Console RBG 3100 also includes a room sensor which sends the current room temperature to the control Note RXD and TXD must be crossed over RXD on TXD TXD on RXD 9 10 PC Visuali...

Page 17: ...6 pin 9 7 Flue gas sensor 9 8 Remote control The remote control also contains a room sensor which sends the current room temperature to the control Switch settings Override circuit ignores the reduct...

Page 18: ...eating circuit pump 9 4 Jumper setting for actuators The jumpers on the motherboard 3100 must be adjusted to the type of actuator in the air dampers Actuator Jumpers on motherboard 3100 without feedba...

Page 19: ...RC 3 Remote control 3 RC 4 Remote control 4 FS 3 Flow sensor 3 FS 1 Flow sensor 1 ES 1 External sensor 1 FS 2 Flow sensor 2 RC 1 1 Remote control RC 2 Remote control 2 Mixer 3 Mixer 1 Mixer 4 Mixer 2...

Page 20: ...or 3 Sensor 2 Sensor 1 Sensor 4 Sensor 5 HCP 0 N PE1 PE2 A W H A A HCP oil Lambda board 3100 optional View of bottom level Control element 3100 Flat ribbon cable to expansion board 1 Flat ribbon cable...

Page 21: ...onnection for left with right Check dampers can turn Check cable and connection Storage temp low RELOAD W Upper storage tank temperature insufficient for heat supply Info only no error automatic ackno...

Page 22: ...will need to set the secondary air by way of an emission measurement using the Sec air MAX parameter in the air settings If you have a Lambda control it is recommended you carry out an emissions measu...

Page 23: ...hecking the door sensor switch Door sensor A 0 door closed switch activated A 1 door open switch not activated If the insulating door is open the ID fan will start up 6 7 Checking the tightness and sy...

Page 24: ...Press the Enter button A question mark will appear Now enter the code for the Installer or Service user level Confirm by pressing Enter If you enter the wrong code the code for child lock will automat...

Page 25: ...Please note that heating circuits 1 and 3 can be used for solar element 5 8 2 System parameters The actual number of parameters of those listed below depends on the system settings Bypass pump av Yes...

Page 26: ...bda probe is available FHG Turbo 30 FHG Turbo 40 Comb chamb sensor av N Y if a combustion chamber sensor is available FHG Turbo 50 FHG Turbo 70 Actuator with feedback N Y Actuators with feedback have...

Page 27: ...PEN A 0 Primary air damper OPEN Prim fl CLOSED A 0 Primary air damper CLOSED Sec fl OPEN A 0 Secondary air damper OPEN Sec fl CLOSED A 0 Secondary air damper CLOSED A 0 Automatic OFF A AUTOMATIC A 1 A...

Page 28: ...pressing the ENTER key Short red flashes Warning or error persists not acknowledged Long red flashes Warning or error persists but acknowledged Warning The status LED automatically changes to green as...

Page 29: ...e flue gas temperature Top load point to ensure adequate efficiency if this temperature is exceeded the output will be reduced Flue gas temp start add 20 Flue gas target value increase when heating up...

Page 30: ...each like heating prog 1 You can program up to 14 heating times each with two heating phases These are assigned to the individual days of the week in the parameter Heating circuit 1 4 weekly program...

Page 31: ...switched off Oil boiler Oil boiler storage temp diff 10 The minimum temperature difference between the oil boiler and storage tank which releases the oil boiler loading pump output Oil boiler start d...

Page 32: ...rage temp diff 10 Temperature difference for launching storage tank loading process Residual heat use N This function can only be used in conjunction with a bypass pump return feed mixer The residual...

Page 33: ...iler temperature is exceeded by a set value the status of the boiler will be maintained glow Once the temperature goes back down below the target boiler value the boiler s status will return to heatin...

Page 34: ...100 Mixer Ty 240s ID fan 36 Solar Primary air 76 ERROR DISPLAY Heating times Prim damp pos 77 Heating circuit 1 O2 content 7 9 Heating circuit 2 O2 controller 78 Heating circuit 3 Sec air 77 Sec damp...

Page 35: ...ontrol 17 9 Connection instructions 19 9 2 Mains connection 19 9 3 Heating circuit pumps for underfloor or wall heating 19 9 4 Jumper setting for actuators 19 9 5 Jumper setting for solar control 19 9...

Page 36: ...UMPE 2 PUMPE 3 GEBL SE EINGABE 0 A HEIZUNG 1 PUMPE HZG 0 L GEBL SE 2 3 4 1 2 3 1 Two line display 2 Menu buttons 3 Button Start Stop 4 Status LED 5 Operating display for pumps 6 Fan 7 Switch heater 0...

Reviews: