6 Servicing
6.1 Maintenance schedule
Discharge screw
W
M
VJ
BF
W
M
VJ
BF
4
2
1
3
5
12
TGR / FBR
W
M
VJ
BF
W
M
VJ
BF
1
12
8
10
9
11
7
6
TGR
FBR
W = weekly, M = monthly, Q = quarterly, F = prior to each fill of the store
No. Element
Interval Operation
1 Motor / gears
W
❒ Carry out a general visual inspection of drive motors
➥ No major oil leaks should be visible.
2 Gravity shaft /
safety switch
M
Function test of the safety switch:
❒ Open the inspection cover of the gravity shaft
➥ The system should switch off immediately.
❒ Check the inlet area for material build-up and clean
where necessary.
❒ Close gravity shaft cover
❒ Check fault message on the controller
Servicing
6
Maintenance schedule
Installation and Operating Instructions | M1730116_en
41