![Fröling BFSU Installation And Operating Intructions Download Page 38](http://html1.mh-extra.com/html/froling-0/bfsu/bfsu_installation-and-operating-intructions_2338800038.webp)
4.6.5 Position bulk chute
❒ Position the bulk chute on the flange of the vertical screw
❒ Regulate the height of the bulk chute by adjusting the wheels to the flange of the
vertical screw
❒ Move out the hook on the quick fastener
❒ Move the bulk chute to the flange and secure with the quick fastener
❒ Snap the key plate into place at the safety limit switch
➥ If the key plate does not snap into place at the safety limit switch, it is not
possible to operate the system.
4
Assembly
Install Bunker Filling System
38
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com