
4.6.6 Turning the fitting frame
❒ Loosen the side screws of the fitting frame and lift the fitting frame
❒ Turn the fitting frame by 180° and place it on the bulk chute
❒ Screw the fitting frame onto the bulk chute using the previously loosened screws
NOTICE! The position of the motor for the screw must not be changed!
4.6.7 Final installation steps
Positioning the stickers
❒ Attach the “FRÖLING” sticker to the vertical screw pipe
Assembly
4
Install Bunker Filling System
Installation- and Operating Intructions BFSV / BFSU | M1420116_en
39