Start-up
ACT ES 20 – 500
13 – EN
5 Start-up
5.1 Preliminary
operation
Verify that the operating parameters match with the nominal values stated on the data nameplate
of the dryer (voltage, frequency, air pressure, air temperature, ambient temperature, etc.).
This dryer has been thoroughly tested, packaged and inspected prior to shipment. Nevertheless, the unit
could be damaged during transportation, check the integrity of the dryer during first start-up and monitor
operation during the first hours of operation.
Qualified personnel must perform the first start-up.
When installing and operating this equipment, comply with all National Electrical Code and any
applicable federal, state and local codes.
Who is operating the unit is responsible for the proper and safe operation of the dryer.
Never operate equipment with panels removed.
5.2 First
start-up
This procedure should be followed on first start-up, after periods of extended shutdown or following
maintenance procedures.Qualified personnel must perform the start-up.
Sequence of operations (refer to paragraph 7.1 Control Panel).
Ensure that all the steps of the “Installation” chapter have been observed.
Ensure that the connection to the compressed air system is correct and that the piping is suitably fixed
and supported.
Ensure that the condensate drain pipe is properly fastened and connected to a collection system or
container.
Ensure that the by-pass system (if installed) is closed and the dryer is isolated.
Ensure that the manual valve of the condensate drain circuit is open.
Remove any packaging and other material which could obstruct the area around the dryer.
Activate the mains switch.
ACT ES 200-500 3phase
- Turn on the main switch - pos. A on the control panel.
ACT ES 200-500 3phase
- Wait at least two hours before starting the dryer (compressor crankcase
heater must heat the oil of the compressor).
Turn ON the switch - pos. 1 on the control panel.
Ensure that electronic instrument is ON.
If the temperature displayed on the electronic instrument is sufficiently high, verify that the refrigerating
compressor starts within a few minutes.
NOTE!
– With low temperatures, the refrigerating compressor
will remain OFF.
Ensure the consumption matches with the values of the data plate.
ACT ES 200-500 3phase
- Check the rotation direction of the fan – wait for its first interventions.
Allow the dryer temperature to stabilise at the pre-set value.
Slowly open the air inlet valve.
Slowly open the air outlet valve.
Slowly close the central by-pass valve of the system (if installed).
Check the piping for air leakage.
Ensure the drain is regularly cycling - wait for its first interventions.
Summary of Contents for ACT ES 20-500
Page 15: ...Technical data ACT ES 20 500 15 EN 6 Technical data 6 1 Technical data ACT ES 20 200 1 115 60 ...
Page 16: ...Technical data 16 EN ACT ES 20 500 6 2 Technical data ACT ES 20 500 1 230 60 ...
Page 17: ...Technical data ACT ES 20 500 17 EN 6 3 Technical data ACT ES 200 500 3phase 3 460 60 ...
Page 18: ...Technical data 18 EN ACT ES 20 500 6 4 Technical data ACT ES 200 500 3phase 3 575 60 ...
Page 37: ...Attachments ACT ES 20 500 37 EN 9 1 Dryers dimensions 9 1 1 ACT ES 20 50 ...
Page 38: ...Attachments 38 EN ACT ES 20 500 9 1 2 ACT ES 75 ...
Page 39: ...Attachments ACT ES 20 500 39 EN 9 1 3 ACT ES 100 150 ...
Page 40: ...Attachments 40 EN ACT ES 20 500 9 1 4 ACT ES 200 250 ...
Page 41: ...Attachments ACT ES 20 500 41 EN 9 1 5 ACT ES 300 350 ...
Page 42: ...Attachments 42 EN ACT ES 20 500 9 1 6 ACT ES 400 500 ...
Page 43: ...Attachments ACT ES 20 500 43 EN 9 1 7 ACT ES 200 250 3phase ...
Page 44: ...Attachments 44 EN ACT ES 20 500 9 1 8 ACT ES 300 350 3phase ...
Page 45: ...Attachments ACT ES 20 500 45 EN 9 1 9 ACT ES 400 500 3phase ...
Page 46: ...Attachments 46 EN ACT ES 20 500 9 2 Exploded views 9 2 1 ACT ES 20 30 ...
Page 47: ...Attachments ACT ES 20 500 47 EN 9 2 2 ACT ES 50 ...
Page 48: ...Attachments 48 EN ACT ES 20 500 9 2 3 ACT ES 75 ...
Page 49: ...Attachments ACT ES 20 500 49 EN 9 2 4 ACT ES 100 ...
Page 50: ...Attachments 50 EN ACT ES 20 500 9 2 5 ACT ES 125 150 ...
Page 51: ...Attachments ACT ES 20 500 51 EN 9 2 6 ACT ES 200 250 ...
Page 52: ...Attachments 52 EN ACT ES 20 500 9 2 7 ACT ES 300 350 ...
Page 53: ...Attachments ACT ES 20 500 53 EN 9 2 8 ACT ES 400 500 ...
Page 54: ...Attachments 54 EN ACT ES 20 500 9 2 9 ACT ES 200 250 3phase ...
Page 55: ...Attachments ACT ES 20 500 55 EN 9 2 10 ACT ES 300 350 3phase ...
Page 56: ...Attachments 56 EN ACT ES 20 500 9 2 11 ACT ES 400 500 3phase ...
Page 65: ...Blank pages ACT ES 20 500 65 EN 10 Blank pages ...
Page 66: ...Blank pages 66 EN ACT ES 20 500 ...