GAS COOKTOP INSTALLATION INSTRUCTIONS
(Models with Optional Electric Built-In Oven Combination)
5
GAS COOKTOP
18” Max.
(45.7 cm)
5” Max.
(12.7 cm)
Flare
Union
4” (10.2 cm)
120V/60Hz
Grounded
Outlet
Right Side of
Cabinet
(To be
accessible for
shut-off valve
operation)
Pressure
Regulator
Manual
Shutoff
Valve
Flare
Union
Flexible Connector
Cabinet sides or
filler panel
6 ½” Min.
(16.5 cm)
Figure 5 – TYPICAL GAS COOKTOP INSTALLATION OVER
AN ELECTRIC BUILT-IN OVEN INSTALLED UNDER THE COUNTER
Wall Oven Cabinet
2. Wall Outlet Location
Figure 6
NOTE:
If an outlet
is not available,
have one installed
by a qualified
technician.
12" (30.5 cm)
8"
(20.3 cm)
10" (25.4 cm)
22"
(55.9 cm)
CL
of unit
Recommended area for
120V grounded outlet on
rear wall
CL
of unit
3. Clamp Down Information
Once the cooktop is installed in the counter opening, you
must clamp the unit down as shown.
Figure 7
Cooktop
Foam Tape
Countertop
Angle Bracket
Thumb Screw
To clamp down, insert the bracket with the offset side of
the angle into the slots on each side of the unit. The
thumb screw should then be run through the bracket, up
against the bottom of the counter. Tighten until the unit
draws down.