9

 

 

 

Use of Half Bay 

The POK1/2CAM half bay must always be installed under the last section and 
cannot be used to raise the tower beyond the measurements indicated in the 
manual, but must be used to reach reduced intermediate heights of 60 cm, if 
there are vertical obstructions. 

The half bay is composed of no.4 tie rods per half bay POK1/2TIR + no.2 half 
vertical uprights POK1/2SPAL + no.2 horizontal sills POK DAVANZ. 

N.B. Use is recommended of no.1 half bay per tower only. 

 
 

 

Dismantling and storage 

Dismantling must take place in reverse sequence to that indicated in the assembly instructions.  

It is strictly forbidden to launch components from above, both for the safety of those beneath and for the 
intactness of the components. 

All the elements should be kept, avoiding their deterioration, or loss, or improper use for other functions.  

 

 

Before each use (and after each movement) 

always check the mobile work tower was assembled by regularly and completely 
following the instructions provided to guarantee state-of-the-art execution and if this is in 
the vertical position. 
Before each use, you must ensure all the safety measures were taken to prevent 
accidental movement, applying locking brakes and stabilising brackets. 

 

 

Climbing on the scaffolding is forbidden. 

It is forbidden to also lean one's body over the side section and also push the mobile 
scaffolds from above. 
For mobile scaffolds with various work platforms, work can only take place on one 
platform at a time. 
It is forbidden to overload the work platforms by exceeding the capacities 
indicated. Never use ladders or superstructures to heighten the work 
platforms. It is forbidden to assemble, use or move mobile scaffolds in 
strong wind. 

 

 

Use is not 
permitted of 
bridge 
connections 
between mobile 
work towers and 
a building, or 
between two 
different mobile 
scaffolds.

 

It is not permitted to rest  
and use lifting devices.

 

With the exception of the Frigerio 
pulley specifically for mobile 
scaffolds with a lifting capacity

 

not exceeding 50 kg. This operation 
should only take place inside

 

the mobile scaffold or the area between the stabilising brackets.

 

Summary of Contents for POKER

Page 1: ...mobile scaffolding POKER POKER HD Compulsory warnings for assembly use movements and dismantling of the mobile scaffold This manual must always accompany the mobile scaffold if it must be shown to com...

Page 2: ...2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base No 2 pieces without castors 4 8 1 1 1 1 1 1 1 POK RUOTA Castors 1...

Page 3: ...mbing on the mobile scaffold during assembly use and after each movement always check the brackets are correctly and firmly positioned End Sill POK DAVTER Vertical Upright POK SPALLA For POKER 01 only...

Page 4: ...ngs on the vertical uprights or if necessary the climbing ladders available on request Having passed through the work platform always ensure the trapdoor is closed Always work on a work platform prote...

Page 5: ...e work platform so it is positioned at a distance of approx 0 58 m over the work platform manually tightening the clamps on the vertical tubes N B The anti uncoupling safety devices must be assembled...

Page 6: ...POK DAVANZ Sill 3 0 0 2 2 4 4 6 6 POK DAVTER End Sill 2 9 2 2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base in two...

Page 7: ...m and 1 10 m over the work platform and the other brace acts as an intermediate handrail resting on the 2nd rung over the work platform so it is positioned at a distance of approx 0 58 m over the work...

Page 8: ...on which the tower is moved must be capable of supporting the weight After each movement braking and stabilising the mobile scaffold is compulsory Also check it is perfectly vertical It is forbidden t...

Page 9: ...llowing the instructions provided to guarantee state of the art execution and if this is in the vertical position Before each use you must ensure all the safety measures were taken to prevent accident...

Page 10: ...main contents of specific training planned in the State Regions Agreement on the 21 December 2011 Reference Standards L D 81 9 April 2008 Consolidated Safety Act Uni EN 1004 2005 Mobile access and wo...

Page 11: ...installation of protective equipment against falling The aforementioned equipment may present such a configuration and resistance to avoid or stop falling from workplaces at heights and prevent as muc...

Page 12: ...when workers or loads are on them DECLARATION OF CONFORMITY It is hereby certified that the scaffold on a POKER base was constructed in compliance with Legislative Decree 81 on 9 April 2008 It is also...

Page 13: ...ary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test person Signature Repair date Repair type Name of...

Page 14: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test per...

Page 15: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test pe...

Page 16: ...www frigeriospa com Frigerio Carpenterie S p A V Fermi 6 24050 Orio Al Serio BG Fax 035 525147 E mail info frigeriospa com...

Reviews: