POKER HD use configuration

 

Useful working height

 

+ 2 m

 

5.97

 

5.16

 

Total height: + 1.01 m

 

4.35

 

 Platform height

 

3.54

 

2.74

 

1.93

 

 

Short  
end protection 

POK PROTCO

 

 
 
 

 

Horizontal sill 

POK DAVANZ

 

 

Guardrail  
brace 

POK PROTRAV

 

 

 

Vertical upright 

POK SPALLA

 

 

 

Stabilising 
brackets HD

 

POK 
STAFFAHD

 

 

 
 
 
 
 
 

Base in no.2 pieces

 

POK BN SR

 

 
 
 
 
 
 
 
 
 
 
 

Trapdoor

 

End sill

 

POK DAVTER

 

Guardrail brace 

The guardrail braces (supplied on request) must be assembled 
each time you work or pass on a work platform as indicated in 
the following use configurations. 
The guardrail brace is assembled by coupling the connection 
clamps on the vertical tubes or the sills of the same section. 

To obtain a complete guardrail at regular height, no.2 PROTRAV 
guardrail braces must be assembled for each side: 
A brace as a guardrail under the 4

th

 rung over the work platform 

is positioned at a distance between 0.95 m and 1.10 m over the 
work platform and the other brace acts as an intermediate 
handrail resting on the 2

nd

 rung over the work platform, so it is 

positioned at a distance of approx. 0.58 m over the work 
platform. 

N.B. For each side, installation can be avoided of one of the two 

PROTRAV guardrail braces if the resulting position 
necessary corresponds to a DAVANZ horizontal sill 
component 

Note: 

in versions POKER-HD-04 and POKER-HD-03 

+POK1/2CAM, no.1 intermediate work platform must be  
assembled with all the relevant side protection and toe boards. 

POK BASESSCS 
optional accessory

 

The POKER and POKER-HD scaffold 
has an accessory (optional) POK 
BASESSCS allowing use of specific 
stabilisers/screw levellers (optionals) 
useful to compensate slopes or uneven 
surfaces up to 35 cm.

 

- The levellers must be removed 

beyond the «STOP» incision and 
however no more than 30 cm 
from the base. 

- The levellers must not be used 

to raise the tower, but only to 
level it. 

 

6.78

 

 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

POKER-HD-04

 

 

POKER-HD-03

 

+1/2 CAM

 

 

POKER-HD-03

 

 

POKER-HD-02

 

+1/2 CAM

 

POKER-HD-02

 

POKER-HD-01

 

+1/2 CAM

 

POKER-HD-01

 

Summary of Contents for POKER

Page 1: ...mobile scaffolding POKER POKER HD Compulsory warnings for assembly use movements and dismantling of the mobile scaffold This manual must always accompany the mobile scaffold if it must be shown to com...

Page 2: ...2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base No 2 pieces without castors 4 8 1 1 1 1 1 1 1 POK RUOTA Castors 1...

Page 3: ...mbing on the mobile scaffold during assembly use and after each movement always check the brackets are correctly and firmly positioned End Sill POK DAVTER Vertical Upright POK SPALLA For POKER 01 only...

Page 4: ...ngs on the vertical uprights or if necessary the climbing ladders available on request Having passed through the work platform always ensure the trapdoor is closed Always work on a work platform prote...

Page 5: ...e work platform so it is positioned at a distance of approx 0 58 m over the work platform manually tightening the clamps on the vertical tubes N B The anti uncoupling safety devices must be assembled...

Page 6: ...POK DAVANZ Sill 3 0 0 2 2 4 4 6 6 POK DAVTER End Sill 2 9 2 2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base in two...

Page 7: ...m and 1 10 m over the work platform and the other brace acts as an intermediate handrail resting on the 2nd rung over the work platform so it is positioned at a distance of approx 0 58 m over the work...

Page 8: ...on which the tower is moved must be capable of supporting the weight After each movement braking and stabilising the mobile scaffold is compulsory Also check it is perfectly vertical It is forbidden t...

Page 9: ...llowing the instructions provided to guarantee state of the art execution and if this is in the vertical position Before each use you must ensure all the safety measures were taken to prevent accident...

Page 10: ...main contents of specific training planned in the State Regions Agreement on the 21 December 2011 Reference Standards L D 81 9 April 2008 Consolidated Safety Act Uni EN 1004 2005 Mobile access and wo...

Page 11: ...installation of protective equipment against falling The aforementioned equipment may present such a configuration and resistance to avoid or stop falling from workplaces at heights and prevent as muc...

Page 12: ...when workers or loads are on them DECLARATION OF CONFORMITY It is hereby certified that the scaffold on a POKER base was constructed in compliance with Legislative Decree 81 on 9 April 2008 It is also...

Page 13: ...ary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test person Signature Repair date Repair type Name of...

Page 14: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test per...

Page 15: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test pe...

Page 16: ...www frigeriospa com Frigerio Carpenterie S p A V Fermi 6 24050 Orio Al Serio BG Fax 035 525147 E mail info frigeriospa com...

Reviews: