7
POKER HD use configuration
Useful working height
+ 2 m
M
5.97
M
5.16
Total height: + 1.01 m
M
4.35
Platform height
M
3.54
M
2.74
M
1.93
Short
end protection
POK PROTCO
Horizontal sill
POK DAVANZ
Guardrail
brace
POK PROTRAV
Vertical upright
POK SPALLA
Stabilising
brackets HD
POK
STAFFAHD
Base in no.2 pieces
POK BN SR
Trapdoor
End sill
POK DAVTER
Guardrail brace
The guardrail braces (supplied on request) must be assembled
each time you work or pass on a work platform as indicated in
the following use configurations.
The guardrail brace is assembled by coupling the connection
clamps on the vertical tubes or the sills of the same section.
To obtain a complete guardrail at regular height, no.2 PROTRAV
guardrail braces must be assembled for each side:
A brace as a guardrail under the 4
th
rung over the work platform
is positioned at a distance between 0.95 m and 1.10 m over the
work platform and the other brace acts as an intermediate
handrail resting on the 2
nd
rung over the work platform, so it is
positioned at a distance of approx. 0.58 m over the work
platform.
N.B. For each side, installation can be avoided of one of the two
PROTRAV guardrail braces if the resulting position
necessary corresponds to a DAVANZ horizontal sill
component
Note:
in versions POKER-HD-04 and POKER-HD-03
+POK1/2CAM, no.1 intermediate work platform must be
assembled with all the relevant side protection and toe boards.
POK BASESSCS
optional accessory
The POKER and POKER-HD scaffold
has an accessory (optional) POK
BASESSCS allowing use of specific
stabilisers/screw levellers (optionals)
useful to compensate slopes or uneven
surfaces up to 35 cm.
- The levellers must be removed
beyond the «STOP» incision and
however no more than 30 cm
from the base.
- The levellers must not be used
to raise the tower, but only to
level it.
M
6.78
POKER-HD-04
POKER-HD-03
+1/2 CAM
POKER-HD-03
POKER-HD-02
+1/2 CAM
POKER-HD-02
POKER-HD-01
+1/2 CAM
POKER-HD-01