Frigerio POKER Instructions And Standards For Use Download Page 2

 

 

 

Preliminary operations 

It is compulsory to periodically check each year and 

compile the record on the latter pages of this manual.

 

Before starting to assemble the mobile scaffold, it is good practice to check it is in g ood condition, i.e. intact and 
perfect functionality of its components. In particular, check: 

 The castors, original and suitable for use, are not damaged, rotate and brakes, if 

any (available on request) are working. 

 All the frames and tubes are straight and dent-free; that the frame of the work 

platforms are perfect and the wooden boards are fastened properly. 

 The fastening pawls of the tie rods are intact and not blocked. 

 If necessary, clean and/or lubricate where necessary. 

 

Damaged components should never be used! 

Ensure all components of the mobile scaffold are present, comparing the table below.  
If parts are missing, replacement is forbidden with foreign parts not manufactured by FRIGERIO.  

(N.B: all components of the mobile scaffold are branded FRIGERIO and MADE IN ITALY) 

 

Item codes

 

POKER-01

 

POKER-01 

POK1/2CAM

 

POKER-02

 

POKER-02 

POK1/2CAM

 

POKER-03

 

POKER-03 

POK1/2CAM

 

POKER-04

 

USEFUL WORKING HEIGHT

 

m

 

2.89

 

3.70

 

4.50

 

5.31

 

6.12

 

6.93

 

7.74

 

OVERALL HEIGHT

 

m

 

1.90

 

2.71

 

3.51

 

4.32

 

5.13

 

5.94

 

6.75

 

WORK PLATFORM HEIGHT

 

m

 

0.89

 

1.70

 

2.50

 

3.31

 

4.12

 

4.93

 

5.74

 

POK SPALLA

 

6-rung vertical upright

 

7.4

 

2

 

2

 

4

 

4

 

6

 

6

 

8

 

POK 1/2 SPAL

 

3-rung half vertical upright

 

3.5

 

0

 

2

 

0

 

2

 

0

 

2

 

0

 

POK DAVANZ

 

Sill

 

3.0

 

0

 

2

 

2

 

4

 

4

 

6

 

6

 

POK DAVTER

 

End sill

 

2.9

 

2

 

2

 

2

 

2

 

2

 

2

 

2

 

P TIR L

 

Diagonal tie rod

 

1.1

 

4

 

4

 

8

 

8

 

12

 

12

 

16

 

POK 1/2 TIR

 

Half diagonal tie rod

 

0.8

 

0

 

4

 

0

 

4

 

0

 

4

 

0

 

POK BN SR

 

Complete base (No.2 pieces) 

without castors

 

4.8

 

1

 

1

 

1

 

1

 

1

 

1

 

1

 

POK RUOTA

 

Castors Ø 100mm. black rubber

 

1.2

 

4

 

4

 

4

 

4

 

4

 

4

 

4

 

POK STAFFA

 

Short stabilising bracket

 

1.5

 

0

 

0

 

4

 

4

 

4

 

4

 

4

 

POK PIANO BW

 

Work pl toe board

 

19.0

 

1

 

1

 

1

 

1

 

1

 

1

 

1

 

POK PROTCO

 

Short end protection

 

1.3

 

2

 

2

 

2

 

2

 

2

 

2

 

2

 

POK PROTRAV

 

Guardrail brace

 

2.4

 

2

 

2

 

2

 

2

 

2

 

2

 

2

 

Total weight

 

kg

 

60

 

77

 

91

 

108

 

116

 

133

 

141

 

N.B. Each work platform is composed of: 1 plywood platform with trapdoor, 2 short toe boards, 2 long toe boards. 

Only people in good mental-physical health can access the raised scaffolding.

 

Work cannot be carried out near power lines at a distance of less than five metres 

(Possible oscillations caused by wind should also be taken into consideration).  

 

Ensure the surface on which the scaffold will be erected is level and cannot subside.   
If necessary, use large enough boards to prevent the structure subsiding. 
Ensure that erection of the mobile scaffold is not obstructed by overhead structures,   
such as gutters, cantilevered balconies, suspended cables, etc. 

Instructions for use of POKER mobile scaffold 

WARNING:  

Mobile scaffold towers can only be assembled and dismantled by 
people familiar with the assembly and use instructions, and under the 
supervision of an authorised supervisor. 

2 kN/m

evenly distributed (Class 3)

 

XXCD (integrated vertical ladder, optional inclined ladder) 

1.60 x 0.80 m

 

5.77 m anchored, according to L.D. 81

 

5.77 m not anchored indoors and outdoors, according to 
EN1004

 

Maximum capacity: 
Access: Base 
dimensions:

 

Maximum platform height:

 

2

 

Summary of Contents for POKER

Page 1: ...mobile scaffolding POKER POKER HD Compulsory warnings for assembly use movements and dismantling of the mobile scaffold This manual must always accompany the mobile scaffold if it must be shown to com...

Page 2: ...2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base No 2 pieces without castors 4 8 1 1 1 1 1 1 1 POK RUOTA Castors 1...

Page 3: ...mbing on the mobile scaffold during assembly use and after each movement always check the brackets are correctly and firmly positioned End Sill POK DAVTER Vertical Upright POK SPALLA For POKER 01 only...

Page 4: ...ngs on the vertical uprights or if necessary the climbing ladders available on request Having passed through the work platform always ensure the trapdoor is closed Always work on a work platform prote...

Page 5: ...e work platform so it is positioned at a distance of approx 0 58 m over the work platform manually tightening the clamps on the vertical tubes N B The anti uncoupling safety devices must be assembled...

Page 6: ...POK DAVANZ Sill 3 0 0 2 2 4 4 6 6 POK DAVTER End Sill 2 9 2 2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base in two...

Page 7: ...m and 1 10 m over the work platform and the other brace acts as an intermediate handrail resting on the 2nd rung over the work platform so it is positioned at a distance of approx 0 58 m over the work...

Page 8: ...on which the tower is moved must be capable of supporting the weight After each movement braking and stabilising the mobile scaffold is compulsory Also check it is perfectly vertical It is forbidden t...

Page 9: ...llowing the instructions provided to guarantee state of the art execution and if this is in the vertical position Before each use you must ensure all the safety measures were taken to prevent accident...

Page 10: ...main contents of specific training planned in the State Regions Agreement on the 21 December 2011 Reference Standards L D 81 9 April 2008 Consolidated Safety Act Uni EN 1004 2005 Mobile access and wo...

Page 11: ...installation of protective equipment against falling The aforementioned equipment may present such a configuration and resistance to avoid or stop falling from workplaces at heights and prevent as muc...

Page 12: ...when workers or loads are on them DECLARATION OF CONFORMITY It is hereby certified that the scaffold on a POKER base was constructed in compliance with Legislative Decree 81 on 9 April 2008 It is also...

Page 13: ...ary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test person Signature Repair date Repair type Name of...

Page 14: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test per...

Page 15: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test pe...

Page 16: ...www frigeriospa com Frigerio Carpenterie S p A V Fermi 6 24050 Orio Al Serio BG Fax 035 525147 E mail info frigeriospa com...

Reviews: