Frigerio POKER Instructions And Standards For Use Download Page 6

6

 

 

 

2 kN/m2 evenly distributed (Class 3)

 

XXCD (integrated vertical ladder, optional inclined ladder) 
1.60 x 0.80 m

 

5.77 m anchored, according to L.D. 81

 

5.77 m not anchored indoors and outdoors, according to EN1004

 

Maximum capacity: 
Access: Base 
dimensions:

 

Maximum platform height:

 

 

Integration for instructions for use of POKER-HD scaffolding 

WARNING: 

The POKER-HD version differs due to use of Ø 125 mm castors in nylon 
with a non-crush/anti-swinging hard core and STAFFE-HD brackets that 
provide further strength and stability to the structure. These characteristics 
meet the safety criteria dictated by European standard UNI EN 1004. 

Basically, the POKER-HD can be used 

UNANCHORED

, if assembled with all its components according to the 

configurations indicated below. 

 

Item codes

 

POKER-HD-01

 

POKER-HD-01 

POK1/2CAM

 

POKER-HD-02

 

POKER-HD-02 

POK1/2CAM

 

POKER-HD-03

 

POKER-HD-03 

POK1/2CAM

 

POKER-HD-04

 

USEFUL WORKING HEIGHT

 

m

 

2.92

 

3.73

 

4.53

 

5.34

 

6.15

 

6.96

 

7.77

 

OVERALL HEIGHT

 

m

 

1.93

 

2.74

 

3.54

 

4.35

 

5.16

 

5.97

 

6.78

 

WORK PLATFORM HEIGHT

 

m

 

0.92

 

1.73

 

2.53

 

3.34

 

4.15

 

4.96

 

5.77

 

POK SPALLA

 

6-rung vertical upright

 

7.4

 

2

 

2

 

4

 

4

 

6

 

6

 

8

 

POK 1/2 SPAL

 

3-rung half vertical upright

 

3.5

 

0

 

2

 

0

 

2

 

0

 

2

 

0

 

POK DAVANZ

 

Sill

 

3.0

 

0

 

2

 

2

 

4

 

4

 

6

 

6

 

POK DAVTER

 

End Sill

 

2.9

 

2

 

2

 

2

 

2

 

2

 

2

 

2

 

P TIR L

 

Diagonal tie rod

 

1.1

 

4

 

4

 

8

 

8

 

12

 

12

 

16

 

POK 1/2 TIR

 

Half diagonal tie rod

 

0.8

 

0

 

4

 

0

 

4

 

0

 

4

 

0

 

POK BN SR

 

Complete base in two pieces 

without castors

 

4.8

 

1

 

1

 

1

 

1

 

1

 

1

 

1

 

POK-HD RUOTA

 

Castors Ø 125mm in nylon and red 

strip

 

1.5

 

4

 

4

 

4

 

4

 

4

 

4

 

4

 

POK STAFFAHD

 

Stabilising bracket HD

 

4.5

 

0

 

0

 

4

 

4

 

4

 

4

 

4

 

POK PIANO BW

 

Work pl toe board

 

19.0

 

1

 

1

 

1

 

1

 

1

 

2

 

2

 

POK PROTCO

 

Short end protection

 

1.3

 

2

 

2

 

2

 

2

 

2

 

2

 

2

 

POK PROTRAV

 

Guardrail brace

 

2.4

 

2

 

2

 

2

 

2

 

2

 

6

 

6

 

Total weight

 

kg

 

62

 

78

 

105

 

121

 

130

 

174

 

183

 

 

N.B. Each work platform is composed of: 1 plywood platform with trapdoor, 2 short toe boards, 2 long toe boards. 

 

Stabilising brackets HD

 

The POKER-HD scaffold is assembled as for the 
normal Poker, the difference being the larger HD 
type brackets. 

The brackets must be assembled 45°. 

To avoid vertical slipping, the upper clamp of the 
bracket must be assembled just under the first sill 
(horizontal brace). 

The lower clamp should be fastened as a 
consequence, pulling the bracket towards the 
structure, ensuring it remains well directed on the 
ground. 

In the event of broken, slippery, subsiding or loose 
ground, the scaffold should however be 

 

Long tie rods

 

P TR L

 

 
 
 
 
 
 
 
 
 

Stabilising brackets HD

 

POK STAFFAHD

 

 

Horizontal sill

 

POK DAVANZ

 

 

Vertical upright

 

POK SPALLA

 

anchored. 

Base in no.2 pieces

 

POK BN SR

 

Castor Ø 100 mm.

 

POK RUOTA

 

Summary of Contents for POKER

Page 1: ...mobile scaffolding POKER POKER HD Compulsory warnings for assembly use movements and dismantling of the mobile scaffold This manual must always accompany the mobile scaffold if it must be shown to com...

Page 2: ...2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base No 2 pieces without castors 4 8 1 1 1 1 1 1 1 POK RUOTA Castors 1...

Page 3: ...mbing on the mobile scaffold during assembly use and after each movement always check the brackets are correctly and firmly positioned End Sill POK DAVTER Vertical Upright POK SPALLA For POKER 01 only...

Page 4: ...ngs on the vertical uprights or if necessary the climbing ladders available on request Having passed through the work platform always ensure the trapdoor is closed Always work on a work platform prote...

Page 5: ...e work platform so it is positioned at a distance of approx 0 58 m over the work platform manually tightening the clamps on the vertical tubes N B The anti uncoupling safety devices must be assembled...

Page 6: ...POK DAVANZ Sill 3 0 0 2 2 4 4 6 6 POK DAVTER End Sill 2 9 2 2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base in two...

Page 7: ...m and 1 10 m over the work platform and the other brace acts as an intermediate handrail resting on the 2nd rung over the work platform so it is positioned at a distance of approx 0 58 m over the work...

Page 8: ...on which the tower is moved must be capable of supporting the weight After each movement braking and stabilising the mobile scaffold is compulsory Also check it is perfectly vertical It is forbidden t...

Page 9: ...llowing the instructions provided to guarantee state of the art execution and if this is in the vertical position Before each use you must ensure all the safety measures were taken to prevent accident...

Page 10: ...main contents of specific training planned in the State Regions Agreement on the 21 December 2011 Reference Standards L D 81 9 April 2008 Consolidated Safety Act Uni EN 1004 2005 Mobile access and wo...

Page 11: ...installation of protective equipment against falling The aforementioned equipment may present such a configuration and resistance to avoid or stop falling from workplaces at heights and prevent as muc...

Page 12: ...when workers or loads are on them DECLARATION OF CONFORMITY It is hereby certified that the scaffold on a POKER base was constructed in compliance with Legislative Decree 81 on 9 April 2008 It is also...

Page 13: ...ary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test person Signature Repair date Repair type Name of...

Page 14: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test per...

Page 15: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test pe...

Page 16: ...www frigeriospa com Frigerio Carpenterie S p A V Fermi 6 24050 Orio Al Serio BG Fax 035 525147 E mail info frigeriospa com...

Reviews: