TTJ-0197 (1/97)
(Page 15 of 64)
INSTALLATION INSTRUCTIONS
FOR DC-2 DRAIN KIT
STEP 1
Before sliding chassis into outer shell, turn chassis on its side and add drain hole by drilling ½"
diameter hole as shown in Figure 1.
STEP 2
DC-2 mounts to the bottom of the outer shell as shown in Figure 2 on the right side as you
face the unit. Use two (2) 10 - 24 x 3/8" long machine screws and 10 - 24 hex nuts provided.
STEP 3
SQ, KQ, YQ Models - Drill two ¼" holes in outer shell as shown in Figure 3. Also drill a 3/8"
diameter hole in the base pan 3½" from the back and 3½" from right side.
STEP 4
Small and Medium Chassis Models - Mount in second and third holes from the rear of shell;
See Figure 4.
STEP 5
Large Chassis Models - Mount in third and fourth holes from the rear of shell; see Figure 5.
STEP 6
Connect a suitable length of garden hose or other tubing to end of the drain tube to drain the
condensate away.
Summary of Contents for YL24J35
Page 7: ...TTJ 0197 1 97 Page 7 of 64 COOLING LOAD ESTIMATE FORM...
Page 9: ...TTJ 0197 1 97 Page 9 of 64...
Page 14: ...Page 14 of 64 TTJ 0197 1 97...
Page 26: ...Page 26 of 64 TTJ 0197 1 97...
Page 27: ...TTJ 0197 1 97 Page 27 of 64...
Page 28: ...Page 28 of 64 TTJ 0197 1 97...
Page 29: ...TTJ 0197 1 97 Page 29 of 64...
Page 30: ...Page 30 of 64 TTJ 0197 1 97...
Page 31: ...TTJ 0197 1 97 Page 31 of 64...
Page 32: ...Page 32 of 64 TTJ 0197 1 97...
Page 33: ...TTJ 0197 1 97 Page 33 of 64...
Page 34: ...Page 34 of 64 TTJ 0197 1 97...
Page 35: ...TTJ 0197 1 97 Page 35 of 64...
Page 36: ...Page 36 of 64 TTJ 0197 1 97...
Page 37: ...TTJ 0197 1 97 Page 37 of 64 WIRING DIAGRAM FOR MODELS YS13J33 YM18J34A YL24J35...
Page 39: ...TTJ 0197 1 97 Page 39 of 64...
Page 40: ...Page 40 of 64 TTJ 0197 1 97...
Page 46: ...Page 46 of 64 TTJ 0197 1 97...
Page 47: ...TTJ 0197 1 97 Page 47 of 64...
Page 52: ...Page 52 of 64 TTJ 0197 1 97...
Page 53: ...TTJ 0197 1 97 Page 53 of 64...
Page 57: ...TTJ 0197 1 97 Page 57 of 64...
Page 58: ...Page 58 of 64 TTJ 0197 1 97...