background image

CUSTOMER GUIDANCE

 CAUTION

(1) The power source capacity must be the sum of

the air conditioner current and the current of other
electrical appliances. When the current contracted
capacity is insufficient, change the contracted ca-
pacity.

(2) When the voltage is low and the air conditioner is

difficult to start, contact the power company the
voltage raised.

Explain the following to the customer in accordance with the operat-
ing manual:
(1) Starting and stopping method, operation switching, temperature

adjustment, timer, air flow switching, and other remote control unit
operations.

(2) Air filter removal and cleaning, and how to use the air louvers.
(3) Give the operating and installation manuals to the customer.

POWER

TEST RUNNING

Perform test operation and check items 1 and 2 below.

For the test operation method, refer to the operating manual.

The outdoor unit, may not operate, depending on the room temperature. In this case, press the test run button on the remote control unit
while the air conditioner is running, (Point the transmitter section of the remote control unit toward the air conditioner and press the test run
button with the tip of a ball-point pen, etc.)

To end test operation, press the remote control unit START/STOP button.
(When the air conditioner is run by pressing the test run button, the OPERATION indicator lamp and TIMER indicator lamp will simultaneously
flash slowly.)

1. INDOOR UNIT

(1) Is operation of each button on the remote control unit normal?
(2) Does each lamp light normally?
(3) Do the air flow-direction louver operate normally?
(4) Is the drain normal?

2. OUTDOOR UNIT

(1) Is there any abnormal noise and vibration during operation?
(2) Will noise, wind, or drain water from the unit disturb the neighbors?
(3) Is there any gas leakage?

Fig. 18

 WARNING

(1) The rated voltage of this product is 208/230 V AC

60 Hz.

(2) Before turning on the power, check if the voltage

is within the 208 V-10% to 230V+10% range.

(3) Always use a special branch circuit and install a

special receptacle to supply power to the room
air conditioner.

(4) Use a circuit breaker and receptacle matched to

the capacity of the air conditioner.

(5) Do not extend the power cord.

(6) Perform wiring work in accordance with stand-

ards so that the air conditioner can be operated
safely and positively.

(7) Install a leakage circuit breaker in accordance with

the related laws and regulations and electric com-
pany standards.

PUMP DOWN OPERATION (FORCED COOLING OPERATION)

To avoid discharging refrigerant into the atmosphere at the time of relocation or disposal, recover refrigerant by doing the cooling operation or
forced cooling operation according to the following procedure. (When the cooling operation cannot start in winter, and so on, start the forced
cooling operation.)

(1) Do the air purging of the charge hose by connecting the charging hose of gauge manifold to the charging port of 3 way valve and opening the

low-pressure valve slightly.

(2) Close the valve stem of 2 way valve completely.
(3) Start the cooling operation or following forced cooling operation.

Keep on pressing the MANUAL AUTO button of the indoor unit for more than 10 seconds.
The operation indicator lamp and timer indicator lamp will begin to flash simultaneously during test run.
(The forced cooling operation cannot start if the MANUAL AUTO button is not kept on pressing for more than 10 seconds.)

(4) Close the valve stem of 3 way valve when the reading on the compound pressure gage becomes 0.05~0 MPa (0.5~0 kg/cm

2

).

(5) Stop the operation.

• Press the START/STOP button of the remote control unit to stop the operation.
• Press the MANUAL AUTO button when stopping the operation from indoor unit side.
  (It is not necessary to press on keeping for more than 10 seconds.)

CAUTION

During the pump-down operation, make sure that the compressor is turned off before you remove the refrigerant piping.

Do not remove the connection pipe while the compressor is in operation with 2 way or 3 way valve open. This may cause abnormal
pressure in the refrigeration cycle that leads to breakage and even injury.

Transmitter section

Test run button

Summary of Contents for M12YG

Page 1: ...tightly Loose wiring may cause overheating at con nection points and a possible fire hazard When Transporting Be careful when picking up and moving the indoor and outdoor units Get a partner to help...

Page 2: ...8 bar for low pressure To increase pressure resistance the hose material and base size were changed A conventional vacuum pump can be used by installing a vacuum pump adapter Special gas leakage detec...

Page 3: ...ELAY FUSE OR HACRTYPE CIRCUIT BREAKER Cut each pipe to the appropriate length 12 30 cm to16 40 cm to dampen vibration between units B Foamed polyethylene insulation for copper pipes as required to pre...

Page 4: ...he danger of com bustible gas leakage 2 Do not install near heat sources 3 If children under 10 years old may approach the unit take preventive measures so that they can not reach the unit 4 Install t...

Page 5: ...ozen under low tempera ture environment When installing indoor unit s drain hose outdoors necessary measure for frost protection should be taken to prevent drain water frozen Under low temperature env...

Page 6: ...ut the connection pipe to the nec essary length with a pipe cutter 2 Hold the pipe downward so that cuttings will not enter the pipe and remove the burrs 3 Insert the flare nut onto the pipe and flare...

Page 7: ...ve blank cap and the charging port cap 7 Pump down the system for at least 15 minutes then check if the compound pressure gauge reads 0 1 MPa 76 cmHg 1 bar 8 At the end of pump down close the low pres...

Page 8: ...erminal to over heat or result in unit malfunction A fire hazard may also exist Therefore be sure all wiring is tightly connected Connect wires to the matching numbers of terminals NOTE Connector trad...

Page 9: ...ws to install the cord clamp A For solid core wiring or F cable 1 Cut the wire end with a wire cutter or wire cutting pliers then strip the insulation to about 15 16 25 mm to expose the solid wire 2 U...

Page 10: ...ulation Vinyl tape Pipe Drain hose Cloth tape Wrap with cloth tape Left piping Connection cord Pipe Drain hose For connection from the left rear Connection cord Drain hose Wall pipe Connection pipe Dr...

Page 11: ...al branch circuit and install a special receptacle to supply power to the room air conditioner 4 Use a circuit breaker and receptacle matched to the capacity of the air conditioner 5 Do not extend the...

Page 12: ...djusting inter unit wire harness To connect inter unit wire harness to the terminal correctly please refer to Fig 19 to adjust the length of the part of Inter unit Wire harness ahead from conduit hold...

Page 13: ...e remote con trol unit check that it operates positively Install the remote control unit holder to a wall pillar etc with the tapping screw Fig 20 Remote control unit holder fixing Remote control unit...

Reviews: