23
ENGLISH
- Fix the outdoor unit with a bolt and
nut(ø10mm).
- When installing on the wall, roof or rooftop,
anchor the mounting base securely with a
nail or wire assuming the influence of wind
and earthquake.
- If the vibration of the unit is transmitted to the
pipe, secure the unit with an anti-vibration
rubber.
Anchoring of outdoor unit
Bolt
Tubing connection
Operate the unit for 15~20 minutes, then
check the system refrigerant charge:
- Measure the pressure of the gas side service valve.
- Measure the air temperature from inlet and
outlet of air conditiioner.
- Ensure the difference between the inlet and
outlet temperature is more than 46˚F.
- For reference; the gas side pressure at opti-
mum condition is shown on table (cooling)
The air conditioner is now ready to use.
*The feature can be changed according to a type
of model.
Discharge
temperature
Discharge air
Inlet temperature
Refrigerant
Outside
ambient TEMP.
The pressure of
the gas side
R-410A
95˚F
8.5~9.5kg/cm
2
G(1
20~135 P.S.I.G.)
Evaluation of the performance
2
Insert new batteries making sure that the
(+) and (–) of battery are installed correctly.
3
Reattach the cover by pushing it back in position.
NOTE
!
• Use 2 AAA(1.5volt) batteries. Do not use
rechargeable batteries.
• Remove the batteries from the remote con-
troller if the system is not used for a long time.
Prepare remote controller
Test Running
- Check that all tubing and wiring are properly
connected.
- Check that the gas and liquid side service
valves are fully open.
Insert batteries before using the remote con-
trol. The battery type used is AAA (1.5 V).
1
Remove the battery cover by pulling it ac-
cording to the arrow direction.