LONG TERM STORAGE
FIELD PREPARATION OF AIR HANDLING UNITS
JOHNSON CONTROLS
100 Cumberland Valley Avenue
Waynesboro, PA 17268 USA
Phone: 717-762-2121 • FAX: 717-762-8624
www.johnsoncontrols.com/frick
Form 210.100-SB2 (2016-03)
Supersedes: NOTHING
Subject to change without notice
Published in USA • 05/17 • PDF
© 2017 Johnson Controls International PLC -
ALL RIGHTS RESERVED
AcuAir Applied Details:
1. Main gas burner panel – Install Corrosion Inhibitor (C.I.)
2. Exhaust fan motor(s) – Coat electrical connections with
Cortec anti corrosion spray. Wrap motor(s) and Install C.I.
3. Unit Split – Protect electrical pig tail ends with Cortec anti-
corrosion spray and plastic wrap. Seal electrical junction
box conduit openings.
4. Main blower – Coat electrical connections with Cortec anti
corrosion spray. Wrap motor(s) and Install C.I.
5. Disconnect belts. (Store belts in a dry place)
6. Spray shafts with anti-corrosion spray.
7. Grease bearings on blower shaft.
8. Main 3-phase electrical panel – Assure all conduit openings
through the panel enclosure are completely sealed. Install
desiccant packet sized for panel. Install C.I.
9. AcuAir Quantum or A-B Control panel – Assure all conduit
openings through the panel enclosure are completely
sealed. Install desiccant packet sized for panel. Install C.I.
10. Ammonia detector – Remove chemical cell. Bag and place
in the refrigerator.
11. Smoke Detector(s) – Install C.I. and desiccant pack.
12. Cooling Coils (3) – Check for and document internal
nitrogen pressure charge.
Protection Supplies:
Frick BPC Part # 026-37705-000 Corrosion Inhibitor (C.I.)
(Good for up to 5 cu ft protection)
Frick BPC Part # 026-37706-000 Corrosion Inhibitor (C.I.)
(Good for up to 11 cu ft protection)
Frick BPC Part # 026-37707-007 Anti-corrosion Spray
(For blower and motor shafts and sheaves)
Frick BPC Part # 026-37707-000 Cortec Anti-corrosion Spray
(For electrical connections)
Desiccant packet – Generally available. Size for internal panel
volume. Replace quarterly or as needed.
Follow-up Periodic Documentation:
Form 210.100-SB3 details monthly, quarterly and annual
checks and procedures that must be documented to prove
compliance and forwarded regularly to the Johnson Controls
AcuAir Service Department.