III. Mounting of scraper

• Move scraper across pipe in such

a way that the clamping carriage
is inside the pipe and the scraper
blade is on the surface of the
pipe (Picture 5). The housing
must be flush with the front edge
of the pipe.

Attention!
Do not run the blade over the
pipe surface.

• Setting the clamping carriage.

- Move the clamping carriage

upwards until it is in contact
with the pipe wall (Picture 3).

     The supporting arm of the

clamping carriage should be
roughly parallel to the pipe wall.

  - Tighten twist grip knob

(Picture 6) until all four guide
rollers rest on the pipe surface.

IV. Scraping of pipe surface

• Turn equipment clockwise around

the pipe end.  By turning steadily,
the pipe can be scraped up to the
pipe end (Picture 7).

Attention!
During scraping, the scraper
must be pushed against the pipe
end in order to avoid axial tilting!

Picture 7

Picture 6

Picture 5

Summary of Contents for FWSG 710 L

Page 1: ...1 1 Operating Instructions Scraper Tool FWSG 710 L Technical Equipment...

Page 2: ...e pipe surface along the entire length of the coupler or half of it Scraping the entire length of the coupler is required when a slide over coupler is employed Only half the coupler up to where insert...

Page 3: ...oyment of slide over couplers I Preparation Remove obvious dirt particles from the pipe surface to be scraped using for example a clean grease free piece of cloth Determine length of area to be scrape...

Page 4: ...e housing roughly to relevant dimension marking Picture 2 The blade housing will end up on the left of the marking The position of the blade hous ing will be fine tuned by turning the roller handle un...

Page 5: ...ing carriage upwards until it is in contact with the pipe wall Picture 3 The supporting arm of the clamping carriage should be roughly parallel to the pipe wall Tighten twist grip knob Picture 6 until...

Page 6: ...g result If marking has not been completely removed the scraping process has to be repeated from Point III Apply a chamfer about 0 08 0 11 at the end of the pipe using a hand held scraper Clean the pi...

Page 7: ...e equipment or parts which wear out prematurely due to their environment sand soil etc The tool must be protected from dirt Operational safety The scraper tool FWSG 710 L is based on quality managemen...

Page 8: ...FRIATEC PE ELECTROFUSION SYSTEMS Technical Plastics Division 426 Fairforest Way Greenville SC 29607 Tel 864 286 8800 Fax 864 234 2060 www friatecusa com E Mail thoeng ipexinc com 2062 1 USA Stand 17 0...

Reviews: