6
6
V. Dismantling of the equipment
• Loosen twist grip knob and
remove scraper from pipe.
• In order to prevent injuries or
scraper damage, the blade
housing should be moved up to
the front plate on completion.
VI. Preparing the fusion process
• Remove the swarf.
• Check scraping result.
If marking has not been completely
removed, the scraping process has
to be repeated from Point III.
• Apply a chamfer (about 0.08" –
0.11") at the end of the pipe
using a hand held scraper.
• Clean the pipe before fusion
using PE cleaner with an
absorbent, non-fibrous and
undyed paper.
• Processing the FRIALEN
®
/
FRIAFIT
®
-coupler takes place
according to the installation
instructions.
Attention!
The scraper must be kept clean
and dry and always stored in its
transporting case.