![freor PLUTON SPACE Operation Manual Download Page 10](http://html1.mh-extra.com/html/freor/pluton-space/pluton-space_operation-manual_2331497010.webp)
10
The semi vertical is equipped with shelves, the maximum allowable loads of which
are specified in the main layout. It is forbidden to exceed the indicated maximum
loads. Products may not cover the air circulation channels.
1.6. Intended use
The semi verticals Pluton Space are intended to be used for display of cooled
products. The semi vertical Pluton Space is foreseen for maintaining of average
temperature (0....+10°C) in the
inner space of the semi vertical.
It is forbidden to upload the semi vertical with warm products with higher
temperature than that of the semi vertical. The temperature of the uploaded
products is set by standards that are constantly updated by the respective
organizations. The temperatures of upload products provided below are based on
DIN10508 requirements:
≤
+10
о
C
Fruits, vegetables, butter, cheese and cheese products
≤
+8
о
C
Products of pasteurized, sour milk
≤
+7
о
C
Milk and dairy products, delicacies, ready-made food, snacks,
sandwiches, green salad, game, salad with mayonnaise sauce, cooked
meat products, eggs and their products, sauces
≤
+4
о
C
Household poultry, minced meat and products, rabbit meat, wild hare
meat
≤
+3
о
C
By-products
≤
+2
о
C
Pre-packed minced meat, fresh fish (on ice)
The semi vertical Pluton Space has to be protected against external mechanical
damage. The shelf load may not exceed the set values.
In the event of the use for unintended purpose the manufacturer will be exempted
from warranty obligations.
1.7. Unpacking and use
To protect the equipment from damage, it may be transported and kept only in the
use condition. Before and during unpacking of the device, perform the inspection
control to determine possible transportation damage. Pay attention whether there
are no unsecured parts, curvatures, scratches, noticeable fluid leaks, etc. Inform
immediately FREOR LT sales department or official partner of FREOR LT about
possible violations prior starting operation. Prior disposing the packaging material,
you should check that there are no unconfirmed functional parts.
Summary of Contents for PLUTON SPACE
Page 1: ...OPERATION MANUAL SEMI VERTICAL PLUTON SPACE...
Page 7: ...7 Fig 5 Dimensions of Pluton Space Island 6 plug in...
Page 20: ...20 Using a rubber hammer attach the rubber bumper...
Page 27: ...27 Unscrew the screws of the compressor cover Remove the compressor cover...
Page 38: ...38 Date Work Name...
Page 39: ...39 Date Work Name...