freor PLUTON SPACE Operation Manual Download Page 1

 

 

 

OPERATION MANUAL 

 

SEMI VERTICAL 

 

PLUTON SPACE 

 
 

 

 

Summary of Contents for PLUTON SPACE

Page 1: ...OPERATION MANUAL SEMI VERTICAL PLUTON SPACE...

Page 2: ...LATION OF THE SEMI VERTICAL PLUTON SPACE 13 4 INSTALLATION OF THE PLUTON SPACE ISLAND 21 5 ACCESS TO THE COMPRESSOR IN THE EVENT OF FAILURE 25 6 CONNECTION OF THE POWER SUPPLY 28 7 GENERAL INSTRUCTION...

Page 3: ...17 TECHNICAL DATA 34 17 1 Technical information 34 17 2 Electrical layouts 34 17 3 Control settings 34 17 4 Setting of values of the control functions 34 17 5 Failures and troubleshooting 34 18 MEANI...

Page 4: ...er information Manufacturer address UAB FREOR LT Katiliskiu St 92 LT 02212 Vilnius Lithuania Phone 37052329188 EN Made in Lithuania Customer Installation date Installation place Start of the product o...

Page 5: ...ticker Fig 1 Labelling table Fig 1 Example of the labelling sticker The instructions are purposed for maintenance and operation of the semi vertical Pluton Space The unit is equipped in accordance wit...

Page 6: ...6 1 2 Dimensions Fig 2 Dimensions of Pluton Space 8 Fig 3 Dimensions of Pluton Space 7 Fig 4 Dimensions of Pluton Space 6...

Page 7: ...7 Fig 5 Dimensions of Pluton Space Island 6 plug in...

Page 8: ...8 1 3 Packaging and its dismounting Unload the semi vertical Unscrew the self cutting screw M6x100 ISO 7380 Remove the unit from the pallet x 2 Size 10 15 min...

Page 9: ...gnited mixture of gas and air Only the manufacturer s approved electrical devices may be used for shelves of food products The refrigeration system may be operated only by maintenance personnel author...

Page 10: ...iry products delicacies ready made food snacks sandwiches green salad game salad with mayonnaise sauce cooked meat products eggs and their products sauces 4 C Household poultry minced meat and product...

Page 11: ...ment in front of heating radiators heaters and near air outlets Do not direct the heat sources or spot radiators such as incandescent lamps to the unit Any heat emitted to the unit increases operating...

Page 12: ...es the maximum allowable loads are specified in the main layout sticker example in fig 3 The sticker is attached to right corner of inner ceiling It is forbidden to exceed the indicated maximum loads...

Page 13: ...13 3 INSTALLATION OF THE SEMI VERTICAL PLUTON SPACE X2 Size 17 32 Install plastic legs Apply silicone and screw the nozzle into the condensate drainage opening...

Page 14: ...ount the transportation profile Using the front and rear legs perform horizontal and vertical pre adjustment of the semi vertical The leg is adjustable in 5 cm Using the level perform horizontal and v...

Page 15: ...15 Insert the guides as shown in the figure With the adhesive foam tape seal connection gaps Apply silicone to seal the connection gaps...

Page 16: ...f the guides and put together the furniture To achieve a more robust connection compress the cabinet legs Insert threaded rods with washers into the indicated places and tighten them with the wrench T...

Page 17: ...indicated places and tighten it with the wrench Threaded rod M10x90 ISO 7985 Insert threaded rod with washers into the indicated places and tighten it with the wrench Threaded rod M10x90 ISO 7985 Sea...

Page 18: ...18 Insert the cover onto the indicated place Take the bracket to install the lower dust cover Insert the threaded staples as shown in the figure Secure brackets on the legs...

Page 19: ...19 Secure the threaded staples to the dust cover Connect the dust covers using the self cutting screws M4x13 ISO 7380 Put on the dust covers and fasten them with the self cutting screws M4x13 ISO 7380...

Page 20: ...20 Using a rubber hammer attach the rubber bumper...

Page 21: ...21 4 INSTALLATION OF THE PLUTON SPACE ISLAND Size 8 Insert the guides as shown in the figure With the adhesive foam tape seal connection gaps...

Page 22: ...y silicone to seal connection gaps Perform the final match of the guides and put together the furniture Insert the self cutting screws M4 8x19 ISO 1479 into indicated places and tighten them using the...

Page 23: ...1479 into indicated places and tighten them using the wrench Seal the bottom connection joints with silicone Put on the condensing block on the top of the semi vertical It is necessary to pay attenti...

Page 24: ...g block fastening it with the self cutting screws M4 8x19 ISO 1479 Put on the end dust cover and tighten the self cutting screws 2x13 ISO 7380 Put on the front dust covers and tighten the self cutting...

Page 25: ...25 Using a rubber hammer attach the rubber bumper 5 ACCESS TO THE COMPRESSOR IN THE EVENT OF FAILURE Open the door Remove the air intake grille...

Page 26: ...26 Remove the bottom shelves Unscrew screws and remove the bottom tin plate of the wall Unscrew screws and remove the tin plate of the wall...

Page 27: ...27 Unscrew the screws of the compressor cover Remove the compressor cover...

Page 28: ...ormance of the semi vertical Excess humidity in the premise can cause occurrence of condensate on cold surfaces of the semi vertical The semi vertical has to be protected against exposure to sunlight...

Page 29: ...open semi verticals should be covered with curtains 7 2 Operation The semi verticals Pluton Space are installed in the shopping premises at a predefined location The cabinets have to be interconnecte...

Page 30: ...Evaporators have to be regularly defrosted in accordance with programs set in the control During the defrosting refrigeration is not run Evaporators of high temperature cabinets can be defrosted usin...

Page 31: ...nded to use special detergents purposed for dyed surfaces After washing the surfaces must be well dried up The paint damage can cause metal corrosion at the scratch place Glass parts can be washed usi...

Page 32: ...quest of the customer the semi verticals can be supplied with a door or mechanical night curtains During non business hours of the shop open showcases must be closed with the night curtains Make sure...

Page 33: ...ting it is necessary to remove all transportation fasteners screws and packages After transportation of the semi verticals to the facility carefully inspect the whole equipment and all its components...

Page 34: ...description reset ENABLE ALARM parameters involved E0 active ON probe 1 error control automatic E1 not active ON probe 2 error defrost automatic d0 0 1 4 F0 1 E2 not active ON probe 3 error condenser...

Page 35: ...the freezer compartments Contamination of the freezing coil Damage of the tightness of the freezing coil Failure of the control valve TRV ERV Leakage of the refrigerant Call the refrigeration technici...

Page 36: ...nged phases one phase cabinet elements can be operational Check switches Check the network The compressor is out of order Refrigeration cycle disorders Signals of the pressure sensors Fluctuations of...

Page 37: ...37 18 MEANINGS OF SYMBOLS Symbol Meaning Type Qualified specialist Work clothing Protective gloves Wrench Sizes 8 10 17 32 Screwdriver Rubber hammer Protective goggles Silicone pistol Clamp...

Page 38: ...38 Date Work Name...

Page 39: ...39 Date Work Name...

Page 40: ...ufacturer of the commercial refrigeration equipment Katiliskiu St 92 LT 02212 Vilnius Lithuania T 370 5 232 9188 E sales freor com www freor com DOM 3CX0X X0000E_v1 1 FREOR LT is not affiliated with C...

Reviews: