14
16
16. Note: This step requires the parts that you
removed in step 5.
Attach the Access Cover (41) to the Tower (1)
with the six M6 x 10mm Screws (61) and the six
M6 Large Washers (62);
start all the Screws,
and then tighten them.
15
15. Note: This step requires the parts that you
removed in step 6.
Attach the Tower Brace (8) to the Tower (1) with
the four M10 x 20mm Screws (74) and the four
M10 Washers (58);
start all the Screws, and
then tighten them.
8
58
58
74
1
62
61
41
1
61
62
61
62
62
61
61
62
61
62
17.
Make sure that all parts of the strength equipment are properly tightened.
To protect the floor or carpet
from damage, place a mat under the strength equipment.