13
14
14.
Repeat steps 8–13 on the other side of the
strength equipment.
Note: This step requires the parts that you
removed in step 7.
Attach the Cap (38) to the Tower (1) with the four
M6 x 16mm Screws (57) and the four M6 Washers
(63);
start all the Screws, and then tighten
them.
57
63
63
38
1
57