14
Example: TS-LS500 Application Setup
Group Name
Parameter Name
Parameter Value
Lines
Number of lines
3
Line 1
Name
Unleaded Line
Submersible Pump Module
Relay Module
Submersible Pump Channel
Unleaded STP
Transducer
Unleaded Transducer
Enable SLLD
Yes
Product
Unleaded
Enabled
Yes
Pressure Up Test Wait Time
4 Sec
Catch pressure Wait Time
2 Sec
Dispenser Pressure Test
Yes
Gross Tests
Enable
Yes
Monthly Tests
Enable
Yes
Wait Period Between Passed Tests
0 Days
Shutdown on Failed Test
Annual Tests
Enable
Yes
Wait Period Between Passed Tests
0 Days
Shutdown on Failed Test
NOTE:
Do not enable the line in set-up until the transducers have been properly connected to
the 4-20 Input Module.
Summary of Contents for TS-LS500
Page 1: ...TS LS500AUTO LEARN LINE LEAK DETECTION INSTALLATION GUIDE...
Page 37: ...33 Control Drawing 1...
Page 38: ...34 Control Drawing 2...
Page 39: ...Intentionally Blank...
Page 40: ...000 2145 r11...