4. Installation
4.1 Transport and construction site storage
Please note
Check all components for completeness
and intactness upon delivery.
Damaged parts must NOT be installed.
Do NOT throw components,
they include breakable parts!
The shaft components are delivered
packaged. Unload using appropriate lift-
ing equipment (e.g., excavator, wheel
loader). Use wide hoisting slings.
Protect the material and packaging from
humidity and direct sunlight during stor-
age. Store the components such that
they are not damaged and that they are
protected from getting dirty. The impact
strength of the material decreases in
sub-zero temperatures.
The relevant safety provisions of the
building industry apply.
Delivery includes
SediPoint standard design
Cone with sealing ring
Optional accessories
SediPoint standard design
Base shaft, sediment collector,
operating pipe
Optional accessories
Extension pipe incl. coupling
and 2 sealing rings
SediPoint connection set
(optional)
Connection set,
consisting of crosspiece,
coupling KG 315,
bend segment,
coupling KG 200,
extension pipe DN 250
and class D shaft cover
CW 300
Shaft cover
BARD ring
Profile sealing ring
Profile sealing ring
Profile sealing ring
Coupling
SediPoint
extension pipe
SediPoint
connection set
SediPoint