5
THE INSTALLATION PROCEDURE
Install the Franke Omni 4in1 kitchen tap
Carrying out this operation first will make it easier to plan
the layout inside the cabinet. For safety, it is advisable to
locate the tap at, or towards, the back of the sink out of
reach of smaller children.
1. The tap will require a standard 35mm diameter hole
drilled in the kitchen work surface.
Important note:
before drilling the hole make sure that there is enough
clearance between the tap handles and the back splash
when the handles are in the fully open position.
2. Insert the flexible hoses and the wire lead through the
35mm hole.
Position the tap for the owners convenience. (The tap
can be rotated 180° for left handed operation of the
boiling water function).
3. Working inside the cabinet, slide the gasket (8) and the
clamp plate (5) over the hoses and the two studs at the
base of the tap. Screw the two clamp nuts (6) on to the
studs using the box spanner (7).
4. Check the alignment of the tap then tighten the two
clamp nuts using the box spanner to firmly secure it on
the work surface.
Plan the layout inside the cabinet
• Determine the best positions for the hot and cold mains
water supply.
• Determine the best positions for the boiler and the filter
unit, making sure that the boiler power cable, the flexible
hoses, and the filter cartridge change indicator cable, are
all within comfortable reach of their respective
connection points without them being compressed,
stretched or kinked.
• The boiler must be installed upright with the hose
connections at the top, never on its side.
• Allow a minimum clearance of 80mm at the top of the
boiler for the connecting hoses.
• Choose a location for the filter unit (21) and the stop
valve (23) to allow convenient access for future filter
cartridge changes.
SCALE 1 : 2
240mm
Min
100mm
235mm
385mm
35mm
60mm Max