Drill 14 mm holes into the distribution pipes (b).
12.2
Place the clamper (a) and seals on the pipes, and then screw-fasten from below with
the clamp cover (c).
☞
Apply grease to the O-rings on the guide bushing!
12.3
Insert the grit filters (d) and the guide bushings (e) into the clamper (a).
12.4
Slide the fittings (g) on to the guide bushings.
12.5
Secure the fittings with the grub screws (f).
12.6
Turn on the water supply.
12.7
Check the connections for leaks.
13. Function
Triggering water flow
13.1
Press the push cap.
• Water flows.
• Water flow stops automatically after a set flow duration.
☞
The flow time can be set in the range 1–30 s.
Selecting the temperature
14. Adjusting the Flow Duration
14.1
Use a screwdriver to carefully prise up the plug.
14.2
Remove the plug.
14.3
Loosen the grub screw using a hollow hexagon wrench.
14.4
Remove the push-cap handle.
14.5
Set the flow duration with a screwdriver.
a: Blade width 3 mm
+ longer flow duration (max. 50 s)
– shorter flow duration (min. 1 s)
14.6
Trigger the valve to measure the flow duration.
☞
Important!
When replacing the push-cap handle, ensure that the driver bar latches into the
corresponding slot.
14.7
After setting the required flow time, replace the push-cap handle.
14.8
Reassemble in the reverse order.