ZMI
_001_
2030
0185
75-A
Q
LT
0098
_#SE
N
_#AQ
U
_#V3
.f
m
- 6 -
9. Installation example
10. Spray pattern
11. Assembly
Warning!
Only operate the fitting with non-return valves and the specified filters.
Failure to observe this instruction can result in an increased germ load in the
drinking water and thus pose a health or mortality risk.
☞
Important!
Prior to the assembly process, flush the pipework in accordance with DIN 1988.
☞
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
☞
Depending on the composition of the wall, special wall plugs may have to be used
(to be provided by the customer).
Fig. A: Water connection from above
Fig. B: Water connection from the rear
11.1
Only for water connection from the rear: Install the connection brackets (a) leak-tight.
11.2
Screw in the water volume regulators (b) leak-tight.
11.3
Align the water volume regulators so that the locking screw and operating element
are freely accessible.
11.4
For a shower head height of 2.10 m to 2.30 m, mark drill holes for installation at a
height (c) of 2.14 m to 2.34 m from the top of the finished floor.
11.5
Drill holes in accordance with these markings.
11.6
Insert the wall plugs.
11.7
Screw on the suspension rail.
11.8
Suspend the shower panel.
11.9
Mark the remaining drill holes.
11.10
Remove the shower panel.
11.11
Drill holes in accordance with these markings.
Insert the wall plugs.
11.12
Remove the protective film from the shower panel.
11.13
Seal the shower panel (e.g. with Chromol, not part of the scope of delivery,
see Accessories,
).
11.14
Only for water connection from the rear: Prioritise work steps 11.16 to 11.18.
11.15
Mount the shower panel on the suspension rail and screw tight.
11.16
Establish the water connections.
11.17
Open the water volume regulators using an Allen key.
a: closed
b: open
11.18
Check the water connections for leaks.