COLIBRI
REF. 971.14.11 Z - 971.21.11 Z
l. PREPARE THE HEARTH
Prepare the opening and or hearth .
4. DROP THE LINER DOWN THE CHIMNEY.
6A. FIT SUITABLE VENTILATION INTO THE APPLIANCE SITE SEE SEC 4-4.
7. RUN THE OIL SUPPLY. SEE SEC 4-3.
Run the oil line and, remember that the KBB fire valve may well need in service replacement,
an allowance must be made for this to be easily carried out, should the need arise.
Install fuel tank in line with our instructions in sec 4-3 and run a fuel line up to the rear right
hand side of the appliance, fit the remote firevalve phial, if it is located in a position where the
temperature can exceed 150 deg F, it will trip and need to be reset on the firevalve body.
Fit the isolation valve see figs 7 and 8.
7a RUN THE ELECTRICAL SUPPLIES (optional)
8. FIT THE APPLIANCE.
Before attempting to fit the appliance make sure that it has not suffered any damage in transit
particularly
around the oil control valve area.
Check that the lighting port plug is in situ.
Remove all the burner components, as follows -:
CATALYSER AND RING
Check that the swinging barometric damper is swinging freely and closing properly.
Level the appliance in both directions using the adjuster feet, take great care to make sure that
the oil runs very slightly towards the lighting port, when it first enters the pot.
11. CONNECT THE PLUMBING
12 CONNECT THE CHIMNEY.
13. CONNECT THE ELECTRICAL SUPPLY. (optional)
14. CONNECT THE OIL SUPPLY.
The appliance leaves the factory with the oil control valve correctly adjusted on the O.C.V.
bracket clamping bolts.
Using a small spirit level check the Oil Control Valve which must be made level in both
directions but do not disturb the level of the valve as this can cause a problem on oil flow.
14. FILL THE HEATING SYSTEM WITH WATER AND CHECK FOR LEAKS.
22. FIT ANTI DOWN DRAUGHT COWL AND FINISH FLAUNCH CHIMNEY TOP.
(SHARP SAND / CEMENT.) fig. 2
23. MAKE UP THE OIL SUPPLY AND PURGE THE LINE.
24. REFIT ALL THE INTERNALS AND EXTERNALS OF THE APPLIANCE.
25. TEST FIRE AND COMMISSION.
9-0 COMMISSIONING
Turn on the oil at the isolation valve.
Press the oil safety cut off knob down to trip the oil on via an audible click. Make sure that
the stat is calling.
CHECK FOR OIL LEAKS.
Check that oil does not leak from the pot, valve, descaling device or pipework. If no leaks
proceed as follows -:
Turn the oil flow off.
Empty the pot of all oil.
Remove the lighting port cover.
Turn the oil on to the first position via the flow control knob and when oil can be seen to
trickle into the pot turn it off so as not to allow an excessive build up, all that is required is a
pool the size of a small biscuit.
Dip the lighting wick in the pool of oil and light it, when it is alight place it into the burner
and allow 20 – 30 seconds for the oil to cach fire, remove the lighting wick and replace the
lighting port cover, turn the fuel flow on again at the lowest setting,
Summary of Contents for COLIBRI 971.14.11.Z
Page 13: ...COLIBRI REF 971 14 11 Z 971 21 11 Z Fig 6 Diagram for Parts List...
Page 14: ...COLIBRI REF 971 14 11 Z 971 21 11 Z Fig 8 Fig 9 Fig 10 C C R S S V3V V E...
Page 15: ...COLIBRI REF 971 14 11 Z 971 21 11 Z Fig 11 Fig 12 Fig 13 Fig 14...
Page 16: ...COLIBRI REF 971 14 11 Z 971 21 11 Z Fig 15 Fig 16 Fig 17 Fig 19...