Veggie Wall Instructions
7
9
9
9
9
9
8
4
4
**Only used for stabilization if
reconfiguring your garden bed.
Step 1
:
Screw the Upper Tube (
9
) into the middle tube (
8
) and
tighten. Then, screw the lower tube (
7
) into that tube
segment. Repeat until you have assembled 9 vertical veggie
wall poles in total.
Step 2
:
Place T-connector (
5
) on top of each of the 9 assembled
vertical poles. Then attach an L-connector (
4
) on top of 7 of
the T-connectors, leaving 2 vertical poles with only a T-
connector on top.
Step 3
:
Insert the 2 vertical poles with only T-connectors onto the 2
joints at the entrance of the garden bed. Install all other
vertical poles in the remaining perimeter joints.
**
If you are installing the Veggie Wall on top of an animal
barrier, the vertical poles will be inserted into the top of
the animal barrier joints. Otherwise. these vertical poles
will insert directly into the stakes of the garden bed.
Step 4
:
Connect a long horizontal tube (
10
) in between each of the
vertical poles just installed. For this step we recommend
using a stable step ladder.
Step 5
:
Unravel the nylon mesh netting (
12
) and attach it to the
veggie wall frame with the zip ties provided (
2
).
**