INST._PL_IT_EN_DE_FSC12H_WER.1
24
7. INSTALLATION
Caution: Before the unit is started, please wait 3 to 4 hours with the unit positioned upright.
The unit may be easily moved from one place to another. While moving the unit, make sure it is in upright position, and place it on level
surface.
Open the packaging and remove the upper box. Take the product and other items delivered out of the packaging. Remove the transport protection
tape from the sides of the device.
1. Screw the flat-headed pipe end to the unit’s hot air pipe, making at least 3 full turns.
2. Screw the pipe to the hot air pipe connector, making at least 3 full turns. Next, connect the pipe with the connector to the hot air outlet at the air
conditioner.
If the unit is meant to operate primarily as air conditioner, we recommend to attach the hot air pipe to the windowl window kit is available as an option.
Partially open the window, and put in the window adapter vertically or horizontally. Connect the pipe to the adapter, pressing firmly, and make sure it
won’t disconnect.
Caution: The window kit has been designed to be used with double-leaf or sliding windows/doors. In case any other window type is available, the
window kit cannot be used. Also, please make sure to minimize any air inflow.
Distances to be noted:
The pipe can be extended to no more than 150cm. If extended beyond this limit, its performance will be reduced. The most appropriate length is 50cm.
The hot air pipe has to be installed correctly, otherwise overheating is possible. Do not bend the pipe by more than 30º.
8. WINDOW KIT INSTALLATION
FRAL SUPER COOL FSC12H
PORTABLE AIR CONDITIONER
NOTE:
A small amount of water remains in the drip
trays in the air conditioner. If the air
conditioner is moved too vigorously, it may
spill onto the floor.