Transport platform
SEP Serie
SEP u
ser’s manual Page 56 of 89
Doc no. RD-7243-MA-001-02
7.9.3. Landing door opening
Landing door must be positionned at loading and unloading levels for any landing required while
using the platform.
When in use, landing doors must conform to the following:
•
Doors must be entirely closed to enable any movement of the platform.
•
Doors must open toward the building openings.
•
Doors must be openable form the building side
only
.
•
Doors
must never be
located at more than 4" (100 mm) from the lowered unloading tailgate
landing sill.
•
Doors must be of a minimal height depending on the global enclosure dimensions:
o
Reduced height: the door must be between [43" (1,1m) and 78-3/4" (2,0 m)[
o
Full height: [78-3/4" (2,0 m) and more[
•
Doors
must never exceed
width of the tailgate of more than 8" (200 mm) on any of both (2)
sides.
•
Doors must always display two (2) clear and legible signs at all time:
o
"
PORTE À GARDER FERMÉE, À MOINS QU’UNE PLATEFORME DE
TRANSPORT NE SOIT PRÉSENTE" (French)
or
"GATES TO BE KEPT CLOSED UNLESS TRANSPORT PLATFORM IS PRESENT"
(English)
o
"PERSONNEL AUTORISÉ SEULEMENT" (French)
or
"AUTHORISED PERSONNEL ONLY" (English)
•
Doors
may be required
to be equipped with interlock, see local standard and regulation.
•
Door shall be electrically linked in serie to the ground box (
GC1
).
For any aditionnal design and installation requirements regarding the landing door, refer to the
installation manual:
∞
I
NSTALLATION MANUAL
(RD-7243-MA-002).
Summary of Contents for SEP-5000
Page 1: ......