FPM 627 249 Installation / Handling / Maintenance, List Of Spare Parts Download Page 11

Page 11 

 

INFORMATION FOR PROPER READING OF THE MANUAL 

 
In this manual “left” and “right” is defined in 
terms of the driving direction. 

 

 
Metric thread is used during installation. 
Tighten all screws during installation.  

 

 
 

GENERAL INFORMATION  

 
Belt  hay  rake  is  designed  for  collecting  of  the  mowed  grass  mass  (either  dried  or  fresh)  and 
collecting  of  the  shredded  maize  after  combine  harvesting  or  manual  harvesting  for  further 
shredding. The collecting is prior to the operation of baling by high-pressure presses, or a roll baler 
or  self-loading  trailers.  This  tool  can  also  be  used  for  raking,  spreading  and  turning  of  the  hay  to 
shorten the drying time.

 

Due to its good coping it is suitable for use on all types of terrains. 

 
Belt  hay  rake  is  the  mounting  type  tool.  It  is  connected  to  the  tractors  of  1

st

  and  2

nd

  category 

equipped  with  3-point  linkage  in  compliance  with  ISO  730/I  and  a  six-slot  output  shaft,  diameter 
34,9 mm. The tool is  lifted during transportation and lowered to  the working position  by means  of 
the control levers of the tractor hydraulics. 

 

Belt hay rakes can be aggregated to all tractors manufactured locally or abroad whose engines have 
the  adequate  power  at  540  min

-1 

of  the  PTO  of  the  tractor.

 

The  rake  is  manufactured

 

as  a  very 

reliable tool that requires minimal maintenance. 

 

The Manual is customized for the basic model of the rake.

 

It may happen that a part that corresponds 

to a functional explanation while the shape slightly differs can be built-in to your rake - in that case, 
please do not pay attention to that.  

 

 

 

SPECIFICATION OF TECHNICAL CHARACTERISTICS 

 

 

 

 

BELT HAY RAKE TYPE 

 

 

FPM 627 249/250 

Working width 

1,6 m/1,9 m 

Tractor minimum power output 

8,8 KW and more  

Maximum work rate 

1,6/1,9 ha/h 

Number of collecting bodies 

9/11 

Number of collecting elements  

27/33 

Transmission 

Mechanical  

Working height adjustment  

mechanical, using the lever on the wheel bearing  

Linkage 

3 point linkage 

PTO (rpm) 

540 min

-1 

Threads  

metric 

Weight 

190/195 kg 

 
 

 

Summary of Contents for 627 249

Page 1: ...INSTALLATION HANDLING MAINTENANCE LIST OF SPARE PARTS BELT HAY RAKE FPM 627 249 FPM 627 250 E mail razvoj fpm agromehanika rs info fpm agromehanika rs www fpm agromehanika rs Internet www fpm agromeha...

Page 2: ...representatives or sales service centers with its trained staff can offer you all original parts for belt hay rake for servicing These parts are manufactured and carefully examined in the same factory...

Page 3: ...kes 19 U joint PTO 20 Certificate on applied occupational safety measures 21 Maintenance of the belt hay rake 22 30 List of spare parts WARNING TO YOU USER It is very important that the PTO which is c...

Page 4: ...is a word frequently used to alert the operator and other persons in order to avoid surprises when using belt hay rake DANGER The word DANGER indicates what must not be done because it implies risk T...

Page 5: ...the factory is not responsible for damages caused in transport THE FACTORY IS NOT RESPONSIBLE FOR THE LOSS OF PROFITS DUE TO FAILURE OF THE BELT HAY RAKE OR INJURY OF ANY THIRD PARTY OR FOR ANY ADDITI...

Page 6: ...wheel to the adequate position safety When disconnecting or connecting the belt rake to and from the tractor be particularly careful Before use check the ballast of the front tractor wheels Fix the we...

Page 7: ...den obstacles work with the utmost care Never work with the machine when reversing At the end of the season working with the belt rake it is necessary that the authorized servicer inspect your belt ra...

Page 8: ...elt rake in transport position the tractor hydraulics commands must be blocked against unintentional lowering Do not use the belt rake for work on slopes or transport the belt hay rake by using narrow...

Page 9: ...l no 2 containing the following numbers The field marked by letter Z contains the number of Certificate document on safety at work The field MASA WEIGHT contains the weight of the product The field GO...

Page 10: ...THE MACHINE READ CAREFULLY THE INSTRUCTIONS AND PAY ATTENTION TO THE WARNINGS PROVIDED BEFORE STARTING ADJUSTMENT LUBRICATION OR CLEANING OF THE TOOL TURN OFF THE TRACTOR REMOVE THE KEY AND WAIT TILL...

Page 11: ...slot output shaft diameter 34 9 mm The tool is lifted during transportation and lowered to the working position by means of the control levers of the tractor hydraulics Belt hay rakes can be aggregat...

Page 12: ...cting drive system is performed with the drive pulley and V belt All drive bearings are ball ones sealed and permanently lubricated Height regulating system ensures good coping of ground and is theref...

Page 13: ...tained Therefore observe all the instructions provided in this Manual to obtain maximum performance and quality of work V BELTS The endless V belts should be properly tightened to prevent excessive sl...

Page 14: ...a height of about 8 cm For these working operations it is necessary to remove the belt as schematically shown in Figure 5 V belts should be occasionally thoroughly cleaned and coated with glycerin to...

Page 15: ...0 hours 7 clean all parts of the PTO if not used for a long time If you stick to this plan of lubrication you will achieve longer life of PTO By careful maintenance you avoid failures which may occur...

Page 16: ...t tractor lever to the left arm of the tool and secure it with the existing protectors Fig 4 Pos B 5 Hook the bottom right tractor lever to the right arm of the tool and secure it with the existing pr...

Page 17: ...ving of the basic requirements for work with cardan shaft may result in breaking of cardan shaft or damaging of the belt hay rake 10 All these positions of the belt rake should be marked so that next...

Page 18: ...nected to the tractor levers to the ground Lower it in that position so that all the collecting springs touch the grass and collect it Shape the swaths with the belt which can be regulated see Fig 5 W...

Page 19: ...to shorten it An example of shortening of the cardan shaft is shown in the following Figures 1 Connect one half of the cardan shaft to the tractor and belt rake hold the halves by each other and by di...

Page 20: ...Page 20...

Page 21: ...ift the tool on a wooden stand and place it under a canopy or in a separate facility CAUTION 1 USE THE TRACTOR WITH SAFETY CABIN TO PROTECT THE DRIVER 2 NEVER WEAR CLOTHING THAT MIGHT BE CAUGHT BY PTO...

Page 22: ...e following code and number of the tool batch number and name of spare part List of spare parts Quantity of the needed parts preferred delivery method post express etc full address of the purchaser wi...

Page 23: ...CTION REGULATIONS AND LEGISLATION ON ROAD TRAFFIC FOR YOUR OWN SAFETY ONLY USE ORIGINAL PARTS MANUFACTURED BY FPM AGROMEHANIKA d o o BOLJEVAC MANUFACTURER IS NOT RESPONSIBLE FOR THE CONSEQUENCES OF IM...

Page 24: ...NES Sales department 030 463 455 030 463 356 Service Department 030 463 619 Export import department 381 0 30 463 531 FAX 381 0 30 463 777 FOR YOUR OWN SAFETY AND TO GET ALL THE BEST FROM YOUR BELT HA...

Reviews: