F8L10GW LoRa Gateway
Page 15 of 37
Add
:
11th Floor, A-06 Area, No.370, Chengyi Street, Jimei, Xiamen, Fujian, China.
http://www.four-faith.com
Tel:+86-592-6307217 Fax: +86-592-5912735
Figure 2-3-5 Bracket Installation Diagram
Step 4: Tighten the four screws and fix the gateway on the bracket, then install the
antenna, Figure 2-3-6.