background image

....

....

....

...

-1- DESCRIPTION & EQUIPMENT ADJUSTMENTS

 

 

 

 

Commissioning date 

 

Installation number 

 

 

Nominal Capacity 

 

m³°tH 

Valve serial number 

 

 

Inlet water hardness 

 

°tH 

Tank size 

 

 

Treated water volume 

 

liters 

Resin type 

 

 

Outlet water hardness 

 

°tH 

Resin volume 

liters 

 

Salt quantity 

 

kg 

 

 

 

Regeneration Mode

 

   

Adjustment

 

 

Time clock 

 

............................ 

days 

Metered immediate 

 

............................ 

m³ 

Metered delayed 

 

............................ 

m³ 

Other 

 

............................. 

m³ 

 

 

 

Regeneration Type

 

   

 

Down flow brining 

   

Up flow brining 

1) Backwash 

 

min 

1) Brining & rinse 

min 

2) Brining & rinse 

 

min 

2) Backwash 

min 

3) Rapide rinse 

 

min 

3) Rapide rinse 

min 

4) Brine tank refill 

 

min 

4) Brine tank refill 

min 

Hydraulic adjustment

 

 

Breech number 

 

 

 

 

 

 

Electrical Supply

 

   

 

 

2 LR20 alkaline batteries 

 

Low voltage transformer 5 VDC, 1 A 

 

1 Lithium battery 

 

 

 

 

 

14                                                                 04/04/18

Summary of Contents for INO20

Page 1: ...Model INO20 Time clock Metered SERVICE MANUAL 1 04 04 18...

Page 2: ...SCRIPTION EQUIPMENT ADJUSTMENTS P 14 2 INSTALLATION INSTRUCTIONS P 15 3 INITIAL SET UP P 16 4 USER INTERFACE P 18 5 TROUBLESHOOTING P 19 6 ERROR MESSAGES P 20 7 SPARE PARTS P 21 8 DIMENSIONS SPECIFICA...

Page 3: ...ty kg Regeneration Mode Adjustment Time clock days Metered immediate m Metered delayed m Other m Regeneration Type Down flow brining Up flow brining 1 Backwash min 1 Brining rinse min 2 Brining rinse...

Page 4: ...d be clean and neat free from lime scale and iron It should comply with current regulations Make the necessary changes to prevent troubles Connection to drain should not exceed 2 meters above the valv...

Page 5: ...3 INITIAL SET UP View Access to main features Mixing device B rine tube connexion Analysis taps Hard water inlet Treated water outlet Drain hose barb Bypass Lever 16 04 04 18...

Page 6: ...cure the assembly of the tube Tighten the clamp moderately to prevent over stress 3 6 Connect the brine tube to the valve Use a 9 52 3 8 OD tube Assembly with the quick connection system fitted on the...

Page 7: ...king stops after adjustment 4 2 DISPLAY THE REMAINING VOLUME METERED SYSTEM ONLY Press Next step to switch from time of day to remaining volume Press again to switch back 4 3 INITIATE A REGENERATION P...

Page 8: ...tore the power supply by a professional 4 Verify that the volume decreases when water is used flow indicator runs Verify cable connection and its state Clean up or replace the turbine 5 Contact your i...

Page 9: ...motor operation no short sircuit Drive force too high foreign material damaged part Inspect valve body drive force state of main seals spacers and piston foreign material Er21 to 29 blinking Valve op...

Page 10: ...Kj 34 Eo 521 25mm ou 569 27mm Verification Each year Replacement Every 5 years Inlet outlet seal kit Ref Kj 34 Eo 518 LR20 Alkaline batteries Ref Ba 20 D0 535 Replacement frequency 1 regeneration per...

Page 11: ...View remove screw to access the battery ies 9 DIMENSIONS SPECIFICATIONS SCA 19 STANDARD INO20 STANDARD 22 04 04 18...

Page 12: ...ompliant upon request Minimum pressure in service 2 Bar Maximum pressure in service 8 Bar Static maximum pressure 14 Bar Minimum temperature in service 1 C Maximum temperature in service 45 C except h...

Reviews: