- 38 -
- 39 -
Framing Stud
3. Locate the duct bracket, safety buffer baffle
and decorative cover bracket:
safety stop
mounting hole
2
5/
16
"(
58
.5
m
m
)
4 9/16"(115.5
mm)
Max 29 15/16"(760mm)
Max 30 7/8"(783mm)
Min 27 7/8"(708mm)
4 9/16"(115.5mm)
Hole A
Area C
Hole B
Hole A
Area C
Hole B
Caution:
one of the wood screws(#10×2
9/16"(ST5×65mm)) for main engine must be
fastened to the beam.Screws must be fixed
at hole A and B in the drawing; also wood
screws(#10×2 9/16"(ST5×65mm)) must be fixed
at bracket bores with corresponding wooden
stakes in area C.
Firstly determine the installation central point of
the range hood according to the central point
of the cooker, determine the bracket installation
location based on cooker table and mark the
place for drilling. The cooker table is about 27
7/8" (708 mm) to 30 7/8" (783 mm) away from
the central point of bracket;
The location to install the safety buffer baffle
should be 4 9/16" (115.5 mm) to the left of the
duct bracket and 2 5/16" (58.5 mm) straight up.
The location to install the decorative cover
bracket should generally be 29 15/16 " (760
mm) above the central point of the duct bracket.
Diameter of smoke
tube
Φ
6" (152.5mm)
Diameter of hole digging
Φ
6 1/2" (165mm)
1. Unpack the appliance and check the List of
Accessories.
2. Locate the wooden beam and mark the
location with a pencil.
down on the bottom of the upper cabinet, and
then drill the holes as indicated on the hole-
drilling template.
Caution:
Wear safety goggles when drilling.
In case of batten at the wall facing the bottom
plate, the rear wall side of the paper template
shall be cut as per the thickness of the batten.
If it is necessary to fix the hook on the tile, the
“Rear Wall” side of the hole-drilling template
should be attached to the bottom of the upper
cabinet, using the tile surface as a reference.
6. Remove the protective film of the stainless
steel surface and Grease Cup at both sides of
the range hood.
7. Place the seal (notch downward) at the air
outlet of the machine and fix the outlet housing
with 4 outlet-housing bolts of #8×3/4"(M4×18mm)
(The foot pads and corresponding screws are
provided in the accessory bag in the packing
box of the decorative panel).
8. Lift and position the hood onto the brackets at
the top of the backside while keeping an angle
between the wall and the hood, and then push
the hood against the wall tightly. Secure the
duct to the duct cover and seal the connection
with aluminum tape.
Caution:
Two installers are required to ensure
safe installation.
9. Install the decorative plate.
Fix the decorative panel in place with 4 #6 × 1
7/16" (ST3.5×35mm) wood screws and fix the
decorative panel on the upper cabinet plate (the
wood screws are provided in the accessory bag
in the packing box of the decorative panel).
10. Make sure the hood is leveled. Install the
Grease Cup, and plug the appliance for a test run.
Warning:
Please wear the qualified protective
gloves in operation.
Caution:
Please run the machine and test if
the smoke pipe leaks air after it is sealed with
aluminum foil tape. The smoke pipe should be
able to be straightened as much as possible.
Installation Instructions for the Decorative
Cover Without Upper Cabinet