46
load
to the output of the UPS
2. THDV%<6%
@
Non-linear full load
8. Test with over
load
1. On line mode, Apply RCD load of
130%~150% of rated power to the output of
the UPS
2. with draw the load, the UPS will transfer back
to the line mode
The UPS transfer to
bypass mode in 1s after
over load apply.
9. Endurance test
1. Apply battery of suitable capacity to the
battery input of the UPS
2. Control the mains input to turn on/off with
timer-control contactor or equivalent
equipment. 10s on 2s off,
3. Control rated load to connect/disconnect from
the output of the UPS, with timer-control
contactor or equivalent equipment, 10s on, 1s
off
The UPS work properly
on mains interrupt and
load impact.
If every step is ok, Congratulation, you have successfully finish the maintenance/ repair work
Summary of Contents for Elipse Series
Page 1: ...1 SERVICE MANUAL EL 6 10K Forza...
Page 18: ...18 Figure 4 5 EL6KS EL10KS UPS configuration diagram...
Page 50: ......
Page 51: ...51...