background image

JSC

 

“Forteza”

 

 

“Forteza

 

Tribo

M”

 

operation

 

manual

 

14

 

 

5.6.

 

Cables

 

Termination

 

in

 

Coupling

  

To

 

terminate

 

the

 

cables

 

in

 

the

 

coupling,

 

proceed

 

according

 

to

 

Item

 

5.5.1

 

except

 

that

 

the

 

second

 

cutting

 

of

 

the

 

tribocable

 

is

 

connected

 

to

 

the

 

terminal

 

block

 

instead

 

of

 

non

sensitive

 

cable.

  

To

 

prevent

 

moisture

 

ingress

 

into

 

the

 

coupling

 

use

 

should

 

be

 

made

 

of

 

neutral

 

sealant.

  

5.7.

 

Cable

 

Termination

 

in

 

Terminal

 

Unit

 

(Fig.

 

9)

  

Splice

 

the

 

tribocable

 

end

 

in

 

compliance

 

with

 

Item

 

5.4.

  

To

 

terminate

 

the

 

tribocable

 

in

 

the

 

terminal

 

unit,

 

proceed

 

as

 

follows:

  

 

pull

 

the

 

spliced

 

end

 

of

 

the

 

trobocable

 

through

 

the

 

holes

 

of

 

the

 

braided

 

shield

 

and

 

the

 

terminal

 

unit

 

case;

  

 

use

 

the

 

terminal

 

block

 

to

 

connect

 

the

 

spliced

 

end

 

of

 

the

 

tribocable

 

to

 

the

 

printed

 

circuit

 

board

 

and

 

tighten

 

the

 

fastening

 

screws;

  

 

be

 

sure

 

to

 

insulate

 

the

 

bare

 

portions

 

of

 

the

 

tribocable

 

central

 

conductors

 

from

 

accidental

 

contact

 

with

 

the

 

braided

 

shield;

  

 

slip

 

the

 

braided

 

shield

 

over

 

the

 

cable

 

connector

 

and

 

the

 

bush

 

so

 

that

 

the

 

edges

 

of

 

the

 

braided

 

shield

 

and

 

the

 

bush

 

coincide.

 

In

 

so

 

doing,

 

make

 

sure

 

the

 

tinned

wire

 

leads

 

are

 

arranged

 

through

 

the

 

center

 

of

 

the

 

braided

 

shield

 

contact;

  

 

crimp

 

the

 

braided

 

shield

 

contacts

 

together

 

with

 

the

 

tinned

 

wire.

 

Make

 

sure

 

the

 

diameter

 

is

 

not

 

in

 

excess

 

of

 

16

 

mm;

  

 

slip

 

the

 

terminal

 

unit

 

case

 

over

 

the

 

braided

 

shield;

  

 

put

 

seal

 

and

 

a

 

plug

 

into

 

the

 

terminal

 

unit

 

case;

  

 

tighten

 

the

 

clamp

 

screws

 

so

 

that

 

the

 

terminal

 

unit

 

case

 

fits

 

tightly

 

against

 

the

 

cable.

 

Make

 

sure

 

the

 

locations

 

of

 

clamps

 

and

 

gaskets

 

coincide.

  

 

To

 

prevent

 

moisture

 

ingress

 

into

 

the

 

terminal

 

unit

 

use

 

should

 

be

 

made

 

of

 

neutral

 

sealant

.

  

 

5.8.

 

Installation

 

of

 

Adapter

 

and

 

Coupling

  

The

 

adapter

 

should

 

be

 

installed

 

on

 

the

 

fence

 

at

 

the

 

tribocable

 

and

 

connecting

 

cable

 

joint.

  

The

 

coupling

 

should

 

be

 

installed

 

on

 

the

 

fence

 

at

 

the

 

tribocable

 

cuttings

 

joint.

  

 

To ensure against moisture running down from the cable towards the coupling, be sure to install the 
coupling horizontally over the cable. 

 

 

With

 

all

 

electrical

 

connections

 

completed

 

according

 

to

 

the

 

schematic

 

diagram,

 

use

 

nylon

 

ties

 

being

 

a

 

part

 

of

 

the

 

coupling

 

delivery

 

set

 

to

 

fastened

 

it

 

to

 

the

 

fence.

  

 

5.9.

 

Terminal

 

Unit

 

Installation

  

 

To ensure against moisture running down from the cable towards the terminal unit, be sure to install the 
terminal unit horizontally over the tribocable. 

 

 

With

 

all

 

electrical

 

connections

 

completed

 

according

 

to

 

the

 

connection

 

diagram,

 

use

 

nylon

 

ties

 

being

 

a

 

part

 

of

 

the

 

terminal

 

unit

 

delivery

 

set

 

to

 

fastened

 

it

 

to

 

the

 

fence.

  

Summary of Contents for TRIBO-M

Page 1: ...TRIBOELECTRIC GUARD ALARM FOR PERIMETER AREAS FORTEZA TRIBO M Operation manual 2010 ...

Page 2: ...gid Continuous Fences Fig 2 9 3 1 7 Gate Wicket Fig 3 9 4 Serviceability check 10 4 1 Safety Precautions 10 4 2 Serviceability Check 10 5 Installation and preparation for use 11 5 1 General 11 5 2 SPU Installation 11 5 3 Sensor Laying 12 5 4 Splicing the Ends of the Tribocable and Connecting Cable 12 5 5 Cables Termination in Adapter Fig 8 13 5 5 1 To terminate the cables in the adapter proceed as...

Page 3: ...ature from 5 С to 40 С and relative air humidity up to 80 at 25 С 18 8 3 The storehouse rooms should be free of dust and vapour of corroding agents 18 8 4 Guard alarms may be transported at an ambient temperature from minus 40 С to 50 С and relative air humidity up to 100 at 25 С In transportation be sure to protect them against direct exposure to precipitation and dust 18 8 5 Guard alarms in stan...

Page 4: ...ures the monitoring of the sensor integrity the cable of triboelectric effect the connecting cable being checked as well On their damage short circuit or broken cable the guard alarm system generates an alarm signal on the fault 1 2 Operating conditions The guard alarm system is intended for continuous round the clock operation Its performance is maintained within the set normal values The guard a...

Page 5: ... people from 3 to 5 men and big animals Distance to the guarded zone 0 5 m Driving of wheeled full track and electric battery vehicles Distance to the guarded zone 1 5 m Railway freight and passenger transport Distance to the guarded zone 15 m Power lines up to 500kV Distance to the guarded zone 5 m Exposure to the radar electromagnetic field Is not regulated with a signal processing unit installe...

Page 6: ...e Alarm mod Minimal length of the sensor to be connected tribocable comes to 1 2 m Maximal length of the tribocable to be connected does not exceed 1000 m 4 zones each 250 m Maximal area of detection zone enclosed area depends on the fence type and the way of the sensor laying 1 4 Standard equipment The following equipment is included in the guard alarm delivery set signal processing unit adapter ...

Page 7: ...on SPU is designed in the metal case Located inside the case is an electronic board arranged around which are in circuit elements of the signal processing unit RS485 connection terminals for the external circuits connection and the guard alarm controls Provided on the SPU case are fasteners meant for its installation 2 1 3 Adapter and Coupling The adapter is meant for connecting the sensor togethe...

Page 8: ...ire of rust resistant steel bimetallic wire reinforced barbed tape etc The sensor is mounted directly on the fence flexible elements The supports enabling a violator to get over the fence without touching its flexible elements being available the sensor is mounted on the supports as well The Alarm signal is generated on the flexible fence under local deformation of the fence and the sensor fastene...

Page 9: ...be sure to lay the sensor according to the diagram with stress centers on every bar Fig 2 а To equip rigid fence of wooden materials solid metal plates and corrugated plates be sure to lay the sensor according to the diagram stress centers being made with clamps Figs 2b and 2c Note The stiffener being available at the top of the fence be sure to lay the sensor along this stiffener as well To equip...

Page 10: ...nd maintenance Make sure the measuring instruments switched into the AC circuit are reliably grounded 4 2 Serviceability Check The guard alarm is to be inspected for external defects on its receipt from the Manufacturer Check the guard alarm for serviceability in compliance with Table 4 1 Table 4 1 Description and procedure of check Technical requirements Check of completeness Correspondence with ...

Page 11: ...prove the guard alarm sabotage resistance and to allow for the additional equipment location an alarm button a network controller of the data acquisition and processing system etc Be sure to locate the cabinet and the signal processing unit in it so that the connecting cables of the sensor alarm stub remote monitoring stub and power leads are conveniently connected and the possibility of SPU perio...

Page 12: ...ocable sheath visible deformation without its integrity breaking Sensor cuttings being used interconnect them with a coupling 5 4 Splicing the Ends of the Tribocable and Connecting Cable Splice the ends of the tribocable and connecting non sensitive cable To prepare the tribocable proceed slip a seal over the tribocable remove the external insulation of the tribocable for a distance of 35 to 40 mm...

Page 13: ...e to insulate bare portions of the tribocable and non sensitive cable central conductors from accidental contact with the braided shield slip the braided shield over the cable connector and the bush so that the edges of the braided shield and the bush coincide In so doing make sure the tinned wire leads are arranged through the centre of the braided shield contact crimp the braided shield contacts...

Page 14: ...tact crimp the braided shield contacts together with the tinned wire Make sure the diameter is not in excess of 16 mm slip the terminal unit case over the braided shield put seal and a plug into the terminal unit case tighten the clamp screws so that the terminal unit case fits tightly against the cable Make sure the locations of clamps and gaskets coincide To prevent moisture ingress into the ter...

Page 15: ...on manual 15 6 Controls All controls and configurations can be done using PC program Connect SPU to PC via USB to RS485 connector Provided in standard equipment package Install provided Software For detailed configuration see Appendix 1 ...

Page 16: ...uld be intact 1 2 SPU check for reliable grounding Inspect the points of ground connection visually Tighten the screws up Screw joints should be tightened safely 1 3 Visual inspection of the sensor adapter coupling and terminal unit The sensor adapter coupling and terminal unit should be free of damages The fastening to the fence should be intact 1 4 Guard alarm check for serviceability with the r...

Page 17: ...fence stroke with a wooden stick branch stroke simulation The guard alarm being switched to the Alarm mode use the sensitivity controller to reduce the guard alarm sensitivity and proceed according to Items 2 2 and 2 3 The guard alarm should not go into the Alarm mode upon every check action 2 4 Grounding resistance measurement Use an ohmmeter to measure the grounding resistance R GR should not ex...

Page 18: ... water transport distance unlimited provided the shipping boxes are secured according to the regulations applied to the given transport means 8 2 Guard alarms in Manufacturer s transit packing should be stored in heated and ventilated storehouses with air conditioning located in any macroclimatic areas at an ambient temperature from 5 С to 40 С and relative air humidity up to 80 at 25 С 8 3 The st...

Page 19: ...anual 19 9 Repair and utilization 9 1 All types of the signal processing unit repair are to be performed by the Manufacturer 9 2 Utilization of the signal processing units that are not repairable is to be performed at enterprise JSC Forteza ...

Page 20: ...ters specified in the present Operation Manual use should be made of the following calibrated measuring instruments multimeter accuracy class 2 5 megohmmeter accuracy class 1 5 dynamometer accuracy class 2 Note Use may be made of similar measuring instruments with accuracy class not less than the aforesaid ones ...

Page 21: ...JSC Forteza Forteza Tribo M operation manual 21 Contacts JSC Forteza Tilzes str 38 LT 91112 Klaipeda Lithuania Phone 370 46 411353 Fax 370 46 412231 forteza forteza com www forteza com ...

Page 22: ...JSC Forteza Forteza Tribo M operation manual 22 ...

Page 23: ...JSC Forteza Forteza Tribo M operation manual 23 ...

Page 24: ...JSC Forteza Forteza Tribo M operation manual 24 ...

Page 25: ...JSC Forteza Forteza Tribo M operation manual 25 ...

Page 26: ...JSC Forteza Forteza Tribo M operation manual 26 ...

Page 27: ...JSC Forteza Forteza Tribo M operation manual 27 ...

Page 28: ...JSC Forteza Forteza Tribo M operation manual 28 ...

Page 29: ...JSC Forteza Forteza Tribo M operation manual 29 ...

Page 30: ...JSC Forteza Forteza Tribo M operation manual 30 ...

Page 31: ...JSC Forteza Forteza Tribo M operation manual 31 ...

Page 32: ...JSC Forteza Forteza Tribo M operation manual 32 ...

Page 33: ...JSC Forteza Forteza Tribo M operation manual 33 ...

Reviews: