INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
TARZAN MAZE
Use the side bars to determine the correct
position of the four uprights, ensuring that
they form a perfect square. After placing the
uprights in the holes and ensuring that their
depth is correct (with the top of the upright
approximately 2.2m above the finished
surface level), attach the side bars to the
uprights using 17mm tri-lobes. Attach the
longer arch bar to the opposing side bars
and then the two half arch bars to the other
sides and centre bar using 17mm tri-lobes.
The five pommels on chains will hang from
the outside of each arch bar and the centre
where they connect (the centre chain being
longer than the four outside chains). Dig five
holes approximately 700mm deep below
each of these attachment points. Attach the pommel chains and the chain anchors to the base of the chain
using ‘S’ hooks. (Ensure that the ‘S’ hooks are fully closed using vice-grips, with the small end of the ‘S’ hook
attaching to the chain and the large end connecting to the lug on the top rail). Ensure the chains are taut and
vertical.
Insert the steppers into the same holes as the uprights (as shown) with the top of the steppers approximately
400mm above the finished surface level. Ensure that all uprights and steppers are vertical and that the
pommel chains are taut, and then concrete into the ground. The pommel chains each require footings of
300mm x 300mm x 400mm (deep) and the upright/stepper holes require footings of 300mm x 500mm x
400mm (deep).
Tension the ropes as required by gently sliding the clamps slightly along the rails and then secure in place
(see the diagram bellow) using a tech screw on both sides of each clamp into the rail.