![Forpark Australia Backhoe Installation Manual Download Page 22](http://html.mh-extra.com/html/forpark-australia/backhoe/backhoe_installation-manual_2320467022.webp)
21
FORPARK AUSTRALIA | www.forparkaust.com.au
INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
MUSICAL PIPES
Dig 800mm standard holes in ground for uprights, placed in
1m radius arch and on 334mm step as shown. Arrange
uprights, tall to short – left to right, facing centre of arch,
keep vertical and concrete.
Screw all C/H bolts with nuts to uprights.
Attach all S/S tubes tall to short – left to right with 4 bolts on
each as shown. Keep tubes as parallel as possible and
tighten bolts.
Go back to C/H bolts and adjust them underneath to keep
the head of bolts on about 5mm from tubes and secure the
position with nuts.
Attach both chains to uprights as shown.