31
FORPARK AUSTRALIA | www.forparkaust.com.au
INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
TALK TUBE
Dig 2 holes approximately 700mm deep and 400mm x 300mm, 6m apart
according to the plan. Dig a channel 300mm deep for the tubing
between holes. Insert the tubing in the frames 100mm (use silicone or
duct tape to seal the joints, preventing water leaking in) and place the
frames in the holes and the tubing in the channel. Support the Tube
Frames in the holes, ensuring that the pipe ends for tubing connection
sits approximately 300mm from the finished surface level. Pour concrete
around the base of the legs forming a footing of 400mm x 400mm x
300mm with a tapered top so that water won’t pool around the leg.