14
FORPARK AUSTRALIA | www.forparkaust.com.au
INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
DOG COURSE WEAVE SPIKES
Build as Senior Swing with top bar at 2.5m.
The swing frame is best assembled prior to installation. Assemble the frame while laid
on the ground then roll into the upright position. The uprights are fastened to the top
bar using 25mm tri-lobe bolts. Must use LOCTITE.
Use the frame in its upright position to determine the correct hole position and dig the holes. Senior - 2.5m
from the underside of the top bar to the finished surface level). Concrete
the uprights into the ground using footing sizes as shown
.
Leave the concrete to set for at least 24 hours then attach the seats to the
top bar using ‘S’ hooks, ensuring that the ‘S’ hooks are fully closed using
vice-grips. (The large end of the ‘S’ hook attaches to the swing shackle and
the small end to the chain, with the lower opening away from the seat.)
Dig a hole directly below each suspended chain. Attach
anchors on ends of chains. Allow the chains to hang into
the holes, ensuring that they are taut and pour concrete
300x300x300 in each hole.