PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
5
1a
FLOOR & PANEL LAYOUT
1c
RIGHT & LEFT APEX SECTIONS
1b
SIDE PANELS
Position the floors
in your desired location.
Turn the floors upside down to
secure the
sections together
by screwing through the
adjoining bearers.
Layout the panels
around your summerhouse
base.
We recommend to start in a back corner then
work from the back panels to the front
panels for assembly.
(8x6 & 10x6 only).
Secure the panels into
place by
screwing into the floor bearers.
Attach the Right-Hand Apex Section
by
screwing to the wall panels as shown below.
Secure the Right-Hand Apex Section
to
the
Front and Back Panel as shown below. Repeat
the process for the Left-Hand Apex Section.
Start at a back corner.
See the section layout
on page 4 to confirm position. Secure the
corner as shown below.
Repeat the process for the remaining panels
and
secure
the
panels together.
Make sure
that the bottom frame of the wall panel rests
on the outer edge of the floor. Use 4 x 50mm
screws for the front and back panels only.
(7x5 only).
Please note that the direction
of the floor bearers are different on the 7x5
summerhouse. Secure the panels into place by
screwing into the floor bearers.
EG. INSIDE CORNER
SIDE PANEL
BACK PANEL
EG. BACK PANELS
RIGHT-HAND APEX SECTION
EG. INTO FLOOR BEARERS
EG. INTO FLOOR BEARERS
7X5
8X6 & 10X6
RIGHT-HAND APEX SECTION