background image

BEFORE YOU START

Please read through these instructions to familiarise yourself with your summerhouse. We recommend that you 

check 

all the components

 using the lists found on the front and back pages before you start to build.

All of our summerhouses are constructed in the same way. They simply come with different components depending on 

the type of summerhouse you have. Don’t worry if your fixing pack contains some spare items at the end of the build 
(you haven’t missed a bit!) we have sent you a generic fixing pack to suit the summerhouse range.

Please note that your 

door

 

windows have a coloured protective film on them.

 We advise to keep the protective film 

on, until the build is complete to prevent any possible damages to the windows during assembly.

It is vital that you build your new summerhouse on a solid, level base. Timber or plastic bases are 
ideal, as are concrete slabs or solid concrete.

We recommend using the following tools (not supplied):

If you have an existing base and think it is suitable for your new summerhouse to be sited on, 

it is important that you check it is level and doesn’t deviate by any more than 15mm from edge 
to edge. If this is not the case, the building will twist causing gaps to appear in the sections and 
causing the roof, doors and windows to misalign.

There is more information on base preparation on our website 

www.forestgarden.co.uk

Assembly is relatively straightforward if you follow these step-by-step instructions. 
We recommend aligning components properly before securing them together and 

pre-drilling

screw holes to avoid splitting the timber.

BASE

 

PREPARATION

TOOLS NEEDED

Timber Base 

Self-constructed/ 

Buy pre-made

Concrete

Concrete surface/ 

Concrete slabs

Pro Shed Base

Interlocking 

eco-friendly base

Soil

A base of soil or 

grass only

Broken Slabs/Gaps

Uneven slab sizes 

with no cement

REMINDER

Always pre-drill before 

screwing.

IMPORTANT

Assembly requires 2+ 

adults.

2

PLEASE KEEP PLASTIC BAGS AND SMALL PARTS AWAY FROM CHILDREN

Tape 

Measure

Sharp Knife

Pozidrive & 

Flat-head  

Screwdriver

Drill & 2mm 

Drill Bit

Hammer

Ladder

Spirit Level

Hand Saw

TO AVOID DANGER OF SUFFOCATION, PLEASE KEEP THIS FILM AWAY FROM BABIES AND CHILDREN

Summary of Contents for OPPSUM106DDM

Page 1: ...Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB EU Authorised Representative Authorised Representative Service 77 Camden Street Lower Dublin D02 XE80 Ireland Thank you for purchasing your summerhouse from Forest Garden Simply follow these step by step instructions and our top tips and you ll be enjoying your summerhouse for many years to come If you have any questions or nee...

Page 2: ... think it is suitable for your new summerhouse to be sited on it is important that you check it is level and doesn t deviate by any more than 15mm from edge to edge If this is not the case the building will twist causing gaps to appear in the sections and causing the roof doors and windows to misalign There is more information on base preparation on our website www forestgarden co uk Assembly is r...

Page 3: ...lls and debris to collect on the roof 1 RAISE YOUR SUMMERHOUSE OFF THE GROUND Ideally any concrete base should be the same footprint as the summerhouse to allow surface water to run off without pooling A timber base can also be used Raise your summerhouse 50mm above ground level 2 SEAL THE BEARERS If using a wooden base we recommend treating it with a treatment containing wax or oil Also coat the ...

Page 4: ...ing construction This will apply to all of the corners for your chosen summerhouse 4 IDENTIFY YOUR SUMMERHOUSE From the section layout below identify your summerhouse based on the width and depth dimensions eg 7x5 You ll need this to identify the side panel positions Use the key and visuals below as a guide PANEL POSITION When assemblying your wall panels ensure the timber framing on the panels ar...

Page 5: ...ewing to the wall panels as shown below Secure the Right Hand Apex Section to the Front and Back Panel as shown below Repeat the process for the Left Hand Apex Section Start at a back corner See the section layout on page 4 to confirm position Secure the corner as shown below Repeat the process for the remaining panels and secure the panels together Make sure that the bottom frame of the wall pane...

Page 6: ...te Attach the Back Cover Strips to the corners and adjoining panels Ensure they are flush to the bottom edge of the panels Attach the Front Cover Strips to front corners and adjoining panels Attach the Side Cover Strips to the adjoining side panels Ensure they are flush to the bottom edge of the panels Secure the Door Weather Strips Ensure they are in contact with the floor and against the inside ...

Page 7: ...ge of the OSB Roof Sheets as shown below Repeat the process for both ends Please refer to the assembly step which suits your summerhouse size 7x5 only Screw 1 x Side Roof Strip at each side along the other edge of the OSB Roof Sheets as shown below Ensure they are central Attach a Z brackets onto the face at both ends of your Beam s as shown below The Z brackets will mould into shape once secured ...

Page 8: ...of the felt covers the Roof Strips Tack from the bottom to the top Secure the Fascias with screws as shown below Ensure to screw into the Roof Strips Please refer to the assembly step which suits your summerhouse size FRONT FASCIAS DOOR TOP TIP Use a measuring tape to measure out 2 3 equal lengths cut with a sharp knife Hammer the tacks into the felt Add the tacks at 150mm intervals 4c 8x6 10x6 on...

Page 9: ...CTIVE FILM FROM YOUR DOOR WINDOWS 1 2 PEEL THE PROTECTIVE FILM OFF BY HAND Simply find a loose edge or corner around the frame and peel back to completely remove the film on that surface There will be protective film on the front and back surface of each window APPLY WARM SOAPY WATER We recommend applying warm soapy water to the surface to help loosen the film and rub firmly with a sponge or cloth...

Page 10: ...on A 2ft Window Panel 590x1603mm 2 A SDMS590WP Section A 2ft Window Panel 590x1603mm 2 B SDMS590TWP Section B 2ft Front Window Panel 590x2059mm 1 E SDMS885TWP Section E 3ft Front Window Panel 885x2059mm 1 B SDMS590TWP Section B 2ft Front Window Panel 590x2059mm 1 C SDM885PP Section C 3ft Panel 885x1603mm 2 F SDM1180PP Section F 4ft Panel 1180x1603mm 2 D SDPM885BP Section D 3ft Back Panel 885x1717m...

Page 11: ...ne Benzyl C12 16 Alkyldimethyl Chlorides Dip Treated Basic Copper Carbonate DDA Carbonate DDA Chloride Pressure Treated Wear gloves when handling Avoid inhalation of sawdust Do not use in contact with drinking water or food Do not use for animal bedding or in fish ponds Dispose of treated wood responsibly A B C D E F G H Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS ...

Reviews: