Fonderie SIME RX 26 BF Installer'S Instructions Download Page 11

HOW TO START 

THE BOILER

(fig. 14)

Open the gas cock  and push the main swit-

ch (1). 

HOW TO REGUALTE THE HEATING

TEMPERATURE 

(fig. 14)

Regulate the heating temperature with the

thermostat (9) between 45 and 85°C. The

set  value  can  be  checked  on  the  thermo-

meter (6).

We suggest to keep the temperature above

the minimum 60°C temperature in order to

guarantee best generator performance.

HOW TO UNLOCK THE CONTROL BOX 

(fig. 14)

The red warning signal on the unlock push-

button  will  light  up  if  the  burner  should  not

turn on (2). Press the unlock pushbutton so

that  the  boiler  will  automatically  start  ope-

rating  again. 

This  operation  cannot  be

repeated  for  more  than  2-3  times,  if  the

trouble  continues  it  will  be  necessary  to

get  in  touch  with  the  Authorised  Custo-

mer Service.

HOW TO SHUTDOWN THE BOILER

(fig. 14)

To shutdown the boiler place the main swit-

ch (1) to OFF. 

If  the  boiler  will  not  be  used  for  a  long

period  of  time  we  recommend  to  unplug

the  appliance,  close  the  gas  cock,  the  low

temperatures  if  provided  and  empty  the

hydraulic  system  in  order  to  avoid  dama-

ges to the pipes if the water should freeze 

HOW TO FILL UP THE SYSTEM 

(fig. 14)

Check the hidrometer regularly (5) in order

to  see  that  the  pressure  values  range

between  1-1,2  bar.  Reset  the  pressure  if  it

is lower than 1 bar. When the operation is

over, close the fill up cock.

GAS CONVERSION

If the gas that is to be used if different than

the  one  that  the  boiler  has  been  prearran-

ged  for,  contact  a  technician  authorised  by

SIME to carry out conversion.

CLEANING AND MAINTENANCE

Cleaning and checking of the boiler is man-

datory at the end of the winter.

Maintenance and checking of the applian-

ce  and  of  the  safety  systems  must  be

carried  out  only  by  an  authorised  techni-

cian and it is to be requested

between  April-September.  The  boiler  is

supplied  with  an  electrical  supply  wire

that  is  to  be  replaced  only  with  the  ones

that are sold by Sime.

46

USER’S INSTRUCTIONS

WARNING

– Turn off the appliance when default and/or improper operation occurs, do not try to repair it on your own. Contact the

local Authorised Customer Service.

– Installation of the boiler or any other service or maintenance operation must be carried out only by qualified personnel.

It is absolutely forbidden to tamper the device that has been sealed by the manufacturer.

– This appliance must not be used by children or unskilled persons. Do not touch the door of the combustion chamber and

the glass of the inspection hole because they may be very hot.

– The manufacturer cannot be held liable for damages due to non-intended use of the appliance.

LIGHTING AND OPERATION

KEY 
1

Main switch

2

Cotrol box lock-out

3

4

5

Hidrometer

6

Thermometer

7

Safety stat

8

9

Boiler stat

Summary of Contents for RX 26 BF

Page 1: ...ype of gas supplied Check that the flue pipe for the outlet of the products of the combustion is unobstructed and or has been properly installed Make sure that any shutoff valves are open Make sure th...

Page 2: ...BF Heat output min nom kW 23 2 31 0 kcal h 19 950 26 660 Heat input min nom kW 26 2 34 0 kcal h 22 530 29 240 Cast iron sections n 4 Water content l 15 Power consumption W 155 Maximum water head bar...

Page 3: ...ty valve goes into action When sizing gas piping from the meter to the boiler take into account both the volume flow rates consumption in m3 h and the relative density of the gas in question The secti...

Page 4: ...The boiler is supplied with the connections required for coaxial ducts that can be turned in any direction The maximum horizontal length of the duct must not exceed 2 8 meters Maximum two extensions c...

Page 5: ...alculation in that the sum of the head losses of the single fittings is less than 6 00 mm H2O Intake Outlet 6 meter horizontal pipe 80 x 0 20 1 20 6 meter horizontal pipe 80 x 0 40 2 40 n 2 90 elbows...

Page 6: ...o 35 kW distances in mm A below openable window 600 B below ventilation opening 600 C below eaves 300 D below balcony 1 300 E from adjacent window 400 F from adjacent ventilation opening 600 G from ho...

Page 7: ...nected to an efficient eathing system SIME cannot be held liable for damage to people or things that is due to non earthing of the boiler Always turn off the power supply before doing any work on the...

Page 8: ...continuos spark ing even if the burner is on After 10 sec onds the sparking stops and so does the burner while the lock out lamp appears to be on It occurs if the phase and neutral position on the te...

Page 9: ...ating pressure values have been changed After have ultimated the conversion of the boiler please stick onto the casing panel the plate showing the relevant feeding gas which is included into the kit N...

Page 10: ...operation The fan works but with less revolutions and therefore it does not enable the flue gas pressure switch replace it The principal burner does not burn prop erly flame too high yellow flame Mak...

Page 11: ...e if it is lower than 1 bar When the operation is over close the fill up cock GAS CONVERSION If the gas that is to be used if different than the one that the boiler has been prearran ged for contact a...

Reviews: