Manual #26-0111200-00 / Revision E
ScreenPro Multi-Screen Remote 44
Uploading Files to the ScreenPro Unit
1) Once communications have been established and verified, click on the “Open SCR file to read and upload”
button to begin the upgrade process.
2) Browse to the location where the “
loader.scr
” file is located and click on it. Then click on “Open” to start
transferring the files to the controller.
3) A TRANSFER STATUS box will open and show the status of the upload as it progresses. On the controller,
the VFD will also show the status of the files being uploaded.
4) After several minutes, the loader utility will inform the user that the process is complete.
5) At this point, direct your attention to the Controller where you will see it Relaying files to the ScreenPro. Wait
for this process to complete.
6) Once this is done, it is recommended that the entire system be powered cycled. You can also close the
loader utility at this time.
7) Verify the new software is in the system by looking for the version numbers in the SYSTEM
Æ
SOFTWARE
VERSION
Æ
VERSIONS menu. Make sure that the "Bx" which is installed in your system shows the same
version number, where “B” is for graphics board and “x” is the screen ID number.
8) Once you have verified the version number, it is recommended that a factory reset be performed. This is
done by going to the SYSTEM menu and selecting RESET ALL.