background image

3

DROP-IN • RIDE Technology 

self-contained

Front cover

8

Internal connection

7

Ice transport tube

5

External connection

6

Docking assembly

4

Dispenser preparation

3

Site preparation

2

Unpack

1

Read and complete the following 8 installation steps

Summary of Contents for Horizon Elite HCC1010AJS

Page 1: ...C1010AJS HCC1410AJS HCC1010WJS HCC1410WJS HMC1010AJS HMC1410AJS HMC1010WJS HMC1410WJS HCE1010AJS HCE1410AJS HCE1010WJS HCE1410WJS HME1010AJS HME1410AJS HME1010WJS HME1410WJS See model number configura...

Page 2: ...ast type environments catering and similar non retail applications WARNING To avoid a hazard due to instability of the appliance it must be fixed in accordance with the instructions Configuration Appl...

Page 3: ...ogy self contained Front cover 8 Internal connection 7 Ice transport tube 5 External connection 6 Docking assembly 4 Dispenser preparation 3 Site preparation 2 Unpack 1 Read and complete the following...

Page 4: ...ained DROP IN RIDE Technology Carefully unpack and inspect the contents of your Follett ice machine 1 Unpack 7 16 7 16 DO NOT TILT ICE MACHINE TO ACCESS BOLTS COMPRESSOR DAMAGE WILL RESULT Unpack ice...

Page 5: ...s 15A dedicated circuit 1 50 mm2 wire H_E1410A W requires 20A dedicated circuit 4 00 mm2 wire Plug must be provided by end user and must conform to standard EN 60 335 2 24 of the end destination Potab...

Page 6: ...h bulkhead fitting with flat up and tighten bulkhead nut Position and secure nut locking plate with supplied screws Verify installation of O ring on stainless steel ice transport tube coupling Insert...

Page 7: ...82 55 mm from the front edge of the cross brace The mounting surface for the docking assembly must be solid Do not mount directly onto runners or channels There must be no lip or edge that would hind...

Page 8: ...C 1010 1410 23 5 597 mm 710 22 25 565 mm D 1010 1410 24 610 mm 710 18 457 mm C D E F E 1010 1410 31 787 mm 710 24 609 mm F 1010 1410 15 381 mm 710 14 355 mm Undercounter installation detail CAUTION K...

Page 9: ...ps from forming For long tube runs see guide on page 15 Pitch tube at least 1 4 per foot 6 4mm 0 3m Ice transport tube must drain towards ice machine Ice transport tube to Ice machine Be sure tube end...

Page 10: ...tubing to the 3 4 barb Connect the 1 slip fitting to the 1 stand pipe drain Note Minimum 8 radius on silicone drain line Drain line from the ice machine must have at least 1 4 per foot pitch 6 4 mm 0...

Page 11: ...g Route 3 8 drain tubing through knockout in back of docking station and insert fully into John Guest fitting connection at the rear of the machine chassis Route other end of 3 8 drain tubing to drain...

Page 12: ...rd 7 3 Position plate into opening and secure with supplied screw Power cord 7 4 If water solenoid is already mounted to evaporator Insert potable water line into shut off valve If this is an undercou...

Page 13: ...ransport tube into coupling and tighten nut firmly Ice transport tube 7 7 If water solenoid is already mounted to evaporator Insert potable water line into shut off valve If this is an undercounter in...

Page 14: ...N CLOG HIGH PRES HIGH AMPS SERVICE MAINT CLEAN LOW WATER TIME DELAY SLEEP CYCLE MAKING ICE LOW BIN POWER ON CLEAN TDS HIGH LOW Set the TDS switch on the electrical box HIGH for extended service life L...

Page 15: ...e carefully review air circulation specifications in section 4 1 Remove and discard plastic grille Apply supplied gasket material around entire opening on skin to prevent air recirculation Attach supp...

Page 16: ...ent dips or traps Long tube run recommendations 01113281R05 Follett Products LLC 2 22 801 Church Lane Easton PA 18040 USA Toll free 877 612 5086 1 610 252 7301 www follettice com Maestro Micro Chewble...

Reviews: